Overview
Aashrayaa Eco City
Overview
Aashrayaa Eco City
Overview
Aashrayaa Eco City
Overview
Title & ownership
Approvals
| RERA extensions | Granted · Approved 13 Jun 2022 | |
|---|---|---|
| RERA completion date | 30 Sep 2019 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Location & risks
Construction & progress
Developer
Land · ₹13.41 Cr 56.7%Development · ₹10.25 Cr 43.3%
Loan & collateral
| Escrow bank | Karur Vysya Bank Ltd. · HSR LAYOUT |
|---|
Data room
54 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes ParadiseCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,770 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | – | Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
8 of 47 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aashrayaa Eco City in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Plots in them | 1,037 |
|---|
| Booked | 1,028 of 1,037 (99%) |
|---|
| Unsold | 9 |
|---|
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 540 m from the filed location | Clear |
| Nearest government-flagged flood location | 17.2 km, SAI BABA ASHRAM KADUGODI |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 360 m to the west, an unnamed water body |
| RERA completion date | 30 Sep 2019 | Review |
|---|---|---|
| Work began, as filed | 10 Jan 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.66 Cr |
|---|
| Escrow bank | Karur Vysya Bank Ltd. · HSR LAYOUT |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 14.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 911 m above sea level, plus or minus 4 m | |
| Metro, operational | 17.7 km, Whitefield | |
| Metro, under construction | 14.4 km, KIA Terminal |
| Kempegowda Airport | 31.1 | 34 | 14.9 |
| MG Road (CBD) | 34.9 | 37 | 30.6 |
| Manyata Tech Park | 34.4 | 39 | 24.9 |
| ITPL, Whitefield | 25.4 | 29 | 19.7 |
| Ecospace, Bellandur ORR | 36.0 | 41 | 28.7 |
| Electronic City Ph 1 | 49.7 | 55 | 37.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 700 m to the west, named Ekarajapura on OpenStreetMap |