Overview
Abhee Celestial City Phase 2 (Codename New Dimension)
Part ofAbhee Celestial City2 phases, 3,397 flats
Overview
Abhee Celestial City Phase 2 (Codename New Dimension)
Part ofAbhee Celestial City2 phases, 3,397 flats
Overview
Abhee Celestial City Phase 2 (Codename New Dimension)
Part ofAbhee Celestial City2 phases, 3,397 flats
Overview
Part ofAbhee Celestial City2 phases, 3,397 flats
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 3 | – | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Abhee Celestial City Phase 2 (Codename New Dimension) in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Engrace 3, price locked.
| Nambiar District 25 Phase 2 | about 2.5 km | Locked | |
|---|---|---|---|
| Orion Heights | about 3.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | Locked | |
| Jeevan's Allure | about 3.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 4 km | Locked | |
| Engrace 3 | 4.0 km | Locked | |
| Engrace 4 | 4.1 km | Locked | |
| Coevolve Florenza | 4.1 km | Locked | |
| Engrace Vista | about 4 km | Locked | |
| Poetry Of Earth | 4.3 km | Locked | |
| Inspira Infinity | about 4.5 km | Locked | |
| Mana Jardin Neo | 4.5 km | Locked |
| Abhee Celestial City Phase 2 (Codename New Dimension) This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Nambiar District 25 Phase 2 | about 2.5 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
| Orion Heights | about 3.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
| Jeevan's Allure | about 3.5 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Adarsh Park Heights Phase-2 | about 4 km | 31 May 2027 | 95% (471 of 494) | Locked |
| Engrace 3 | 4.0 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
| Rent, 2BHK, 3 km | ₹27,000 /mo · 5 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹15,000 /mo · 10 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 11 listings with a size |
| Projects within 4 km, counted | 71 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 28,908 | |
| Booked | 14,759 of 28,908 (51%) | |
| Unsold | 14,149 | |
| Booked a month, pooled | 420 flats | |
| Months to sell, pooled | 29 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | A 400 kV line runs along the site's edge, its corridor taking about 2% (about 690 m²) | Review |
| Nearest government-flagged flood location | 3.1 km, Gunjur |
| Nearest storm drain | 1.8 km to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 320 m to the west, an unnamed water body |
| K-RERA registrations under this promoter | 13 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 2 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Nearest city water main | 3.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.8 km to the north, secondary drain | |
|---|---|---|
| Ground level | 902 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.1 km, Nallur Halli | |
| Metro, under construction | 7.6 km, Kodibeesanahalli |
| Kempegowda Airport | 46.0 | 46 | 33.7 |
| MG Road (CBD) | 23.0 | 28 | 18.2 |
| Manyata Tech Park | 27.1 | 33 | 21.5 |
| ITPL, Whitefield | 12.7 | 14 | 9.8 |
| Ecospace, Bellandur ORR | 11.7 | 17 | 8.1 |
| Electronic City Ph 1 | 16.2 | 23 | 10.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.8 km to the south-west, named Domasandra Substation on OpenStreetMap |