Overview
Aditi North Star
Overview
Aditi North Star
Overview
Aditi North Star
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Deputy Commissioner Bengaluru · Survey 28/2
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 10 Jul 2026 · No. BBMP/Addl.Dir/JDNORTH/0036/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3 bedroom + 3 toilet · avg 96 m² 62%2.5 bedroom + 2 toilet · avg 80 m²
Location & risks
Construction & progress
Developer
Land · ₹8.13 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 10 Jul 2026 | |
| Escrow bank | AU Small Finance Bank · 2737- RT Nagar |
Data room
99 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aditi North Star in the interactive atlas
Approval or registration
Khata issued
A Khatha · Bruhath Bengaluru Mahanagara Palike · Survey 28/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0036/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/200826/008882
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 28/2 | |
|---|---|---|
| Land extent, Sy 28/2 | 5,438 sq m | |
| Land area of this registration | 5,438 sq m | |
| Khata | A Khatha · Bruhath Bengaluru Mahanagara Palike · 23 Mar 2023 |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 30 Jan 2018 · Deputy Commissioner Bengaluru | |
|---|---|---|
| Survey numbers | 28/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2.5 bedroom + 2 toilet | 41 | 862 |
| 3 bedroom + 3 toilet | 67 | 1,038 |
| Sold, Q2 2026-27 | 0 / 108 | |
|---|---|---|
| Unsold, Q2 2026-27 | 108 |
| S L V Spring Meadows | about 1.5 km | Locked | |
|---|---|---|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2 km | Locked | |
| Tnm Lakeview | about 2 km | Locked | |
| Godrej Aveline | about 2 km | Locked | |
| Assetz Zen & Sato | about 2.5 km | Locked | |
| Legacy Salvador | about 2.5 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked | |
| Pelican Gardens | about 3 km | Locked | |
| Nvg Rakshak | about 3 km | Locked | |
| Sobha City Athena | about 3 km | Locked |
| Aditi North Star This project | This project is the point the others are measured from | 31 Dec 2030 | 0% (0 of 108) | Not verified yet |
|---|---|---|---|---|
| S L V Spring Meadows | about 1.5 km | 30 Jun 2027 | 28% (30 of 109) | Locked |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.14 (123 covered spaces for 108 units) | |
| Power backup | Declared by the promoter |
| Main structure | Not started · planned by 31 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2029 | |
| Club house | Not started | |
| Completion | 0% | |
| Completion, accountant | 4.4% of the estimated cost spent |
| Schedule end | 31 Dec 2030 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 10 Jul 2026 |
| Building heights, fire NOC | 20.22 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹86.17 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹78.75 Cr | |
| Cost incurred | ₹3.47 Cr (4.4% of the Form 4 Q2 2026-27 estimate) | |
| Receivable, sold flats | ₹0 |
Unsold (108) 100%
| Sold, Q2 2026-27 | 0 / 108 · 108 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 108 |
| Escrow bank | AU Small Finance Bank · 2737- RT Nagar | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2 km | 31 Dec 2027 | 100% (364 of 364) | Locked |
|---|
| Tnm Lakeview | about 2 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
|---|
| Godrej Aveline | about 2 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Projects within 4 km, counted | 59 (59 with an approximate location) | |
|---|---|---|
| Flats in them | 19,629 | |
| Booked | 12,151 of 19,629 (62%) | |
| Unsold | 7,478 | |
| Booked a month, pooled | 459 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 12 km, Yeshwantpur | |
| Metro, under construction | about 2.5 km, Bagalur Cross |
| Kempegowda Airport | 21 | 14 |
| MG Road (CBD) | 18.5 | 14.5 |
| Manyata Tech Park | 9.5 | 6.5 |
| ITPL, Whitefield | 25.5 | 18 |
| Ecospace, Bellandur ORR | 30 | 20.5 |
| Electronic City Ph 1 | 38.5 | 30 |
| Landfill or waste transfer station | about 2 km to the east, named Mitaganahalli Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2 km to the south-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the north, named Hinduja Ecopolis Substation on OpenStreetMap |