Approvals
| Building plan (BMRDA) | Sanctioned 16 Nov 2021 · No. KA YO PRA/LAO/29/2017-18/872 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹3.01 Cr 59.2%Development · ₹2.07 Cr
Loan & collateral
| Developer's project loan | The Karnataka State Cooperative Apex Bank Limited · ₹40.0 L disbursed | |
|---|---|---|
| Records searched to | 20 Aug 2024 | Review |
| Building plan (BMRDA) | Sanctioned 16 Nov 2021 | |
| Escrow bank | IDFC FIRST BANK · basaveshwara nagar |
Data room
141 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aikyam Emerald Grove in the interactive atlas
Transfer of the land
Sale deed
Survey 52
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · REVENUE DEPARTMENT · Survey 52
K-RERA filing, land schedule
Approval or registration
Land use converted
OFFICE OF THE DISTRICT COMMISSIONER · Survey 52
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan KA YO PRA/LAO/29/2017-18/872
K-RERA filing, approvals
Transfer of the land
Title deed executed
Sy 52, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 19 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/051024/007132
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 20 Aug 2024 |
|---|
| Developer's project loan | The Karnataka State Cooperative Apex Bank Limited · ₹40.0 L disbursed |
|---|
Page 1
Page 1 of 53 of the encumbrance certificate. Filed with K-RERA: Current Encumbrance Certificate, 53 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 52 | |
|---|---|---|
| Land extent, Sy 52 | 2 acre 6 guntas | |
| Khata | A Khatha · REVENUE DEPARTMENT · 24 Jan 2009 | |
| Sale deed | Dated 5 Jun 2008 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 17 Apr 2024 |
| Land conversion | Converted 7 Mar 2017 · OFFICE OF THE DISTRICT COMMISSIONER | |
|---|---|---|
| Survey numbers | 52 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 10 (10 with an approximate location) | |
|---|---|---|
| Plots in them | 2,065 | |
| Booked | 593 of 2,065 (29%) | |
| Unsold | 1,472 | |
| Booked a month, pooled | 13 plots | |
| Months to sell, pooled | 64 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9.5 km, Mantri Lake view Appartment Next to Talagattapura Lake |
|---|
| Nearest storm drain | about 1.5 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 17 Apr 2024 | |
|---|---|---|
| RERA completion date | 17 Apr 2024 | |
| Work began, as filed | 16 Nov 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 7 Oct 2024 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 7 Oct 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹5.08 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹1.85 Cr | |
| Estimated cost, chartered accountant's certificate | ₹5.08 Cr, same as the filing |
| Escrow bank | IDFC FIRST BANK · basaveshwara nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Nelaguli Grama Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Metro, operational | about 8.5 km, Silk Institute | |
| Metro, under construction | about 14 km, Kalena Agrahara |
| Kempegowda Airport | 61 | 51 |
| MG Road (CBD) | 27.5 | 23.5 |
| Manyata Tech Park | 36 | 31.5 |
| ITPL, Whitefield | 45 | 34 |
| Ecospace, Bellandur ORR | 32.5 | 25 |
| Electronic City Ph 1 | 29.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Somanahalli Substation on OpenStreetMap |