Good experience from the Builder The project also is very good
Overview
Anuraag Amogh
Overview
Anuraag Amogh
Overview
Anuraag Amogh
Overview
Photo: bibhu datta jenaTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 2 Mar 2022 · No. BBMP/Ad.Com/MDP/0500/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 68 m²
Location & risks
Construction & progress
Developer
Land · ₹1.62 Cr 8.5%Development · ₹17.58 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 2 Mar 2022 | |
| Escrow bank | Union Bank of India · Bhuvaneshwari Nagar |
Data room
127 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Good experience from the Builder The project also is very good
The location of this project is very nice. Promoter and sales executive both are very humble as well as helpful. We also booked a flat. Most importantly work is going fast. Highly recommended for booking.
We've booked a 3bhk flat with them. Very reasonable price and situated at a main location. Building construction quality is good and they have agreed to accommodate the small changes we've requested. If those changes are actually done, then…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 38 & BanyanCompleted · OC 30-03-2022 | ASSETZ BUILDWELL LLP | Apartment | 1,833 sqft carpet (as filed) | Completed |
| Ambaram HomesCompleted (regulator flag) | ARR DEVELOPERS | Apartment | 879 sqft carpet (as filed) | Completed |
| Amber MeadowsCompleted · OC 31-05-2024 | Excel Stone Developers | Apartment | – | Completed |
| Anuraag AbodeCompleted (regulator flag) | ANURAAG CONSTRUCTIONS | Apartment | 861 sqft carpet (as filed) | Completed |
| Ashish A N Reddy ApartmentLapsed · completion date passed | AASHISH DEVELOPER AND BUILDERS | Apartment | 817 sqft carpet (as filed) | Sep 2023 |
| Atz ArevaLapsed · completion date passed | ATZ PROPERTIES | Apartment | 804–1,042 sqft carpet (as filed) | Jun 2026 |
| AuraActive · 9% built | BLUE SKY PROPERTIES | Apartment | 1,089 sqft carpet (as filed) | Apr 2030 |
| Blue Meadows Phase 2Active · 75% built | Yuva Infinity Developers | Apartment | 757–956 sqft carpet (as filed) | Dec 2027 |
8 of 66 other projects in Balagere, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Anuraag Amogh in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 8 Mar 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 2 May 2018 · Deputy Commissioner Bangalore District | |
|---|---|---|
| Survey numbers | 19/5 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 80 | 736 |
| 3BHK | 12 | 950 |
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Poetry Of Earth, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; SOBHA Ayana, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; SOBHA Neopolis, price locked; Reflections 66, price locked; Adarsh Parkland, price locked.
| Poetry Of Earth | 460 m | Locked | |
|---|---|---|---|
| Inspira Infinity | about 1 km | Locked | |
| Adarsh Park Heights Phase-2 | about 1 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | Locked |
| Anuraag Amogh This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Poetry Of Earth | 460 m | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Adarsh Park Heights Phase-2 | about 1 km |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 900 m, Varthur police station | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 50 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 350 m to the north-east, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.00 (92 covered spaces for 92 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 5 Aug 2024 |
|---|
| Possession, agreement | Mar 2024 | |
|---|---|---|
| Schedule end | 31 Mar 2024 | |
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 2 Mar 2022 |
| Building heights, fire NOC | 14.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 50 sq m |
|---|
| Architect's certificate, registration | Site inspected 24 Jun 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 26 Mar 2022 | |
| Chartered accountant's certificate, registration | Dated 26 Mar 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹19.21 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹17.58 Cr |
Sold (51) 55.4%Unsold (41) 44.6%
| Flats sold, at completion | 51 | |
|---|---|---|
| Flats unsold, at completion | 41 | |
| Flats in the phase | 92 |
| Escrow bank | Union Bank of India · Bhuvaneshwari Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 1.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 1.6 km | Locked |
|---|
| SOBHA Ayana | 1.7 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 1.8 km | Locked |
|---|
| Jeevan's Allure | about 2.5 km | Locked |
|---|
| 31 May 2027 |
| 95% (471 of 494) |
| Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,20,000 /mo · 5 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹55,000 /mo · 52 listings | |
| Rent, 2BHK, 3 km | ₹40,500 /mo · 110 listings | |
| Rent, 1BHK, 3 km | ₹18,500 /mo · 77 listings | |
| Rent per sq ft, 3 km | ₹37.2 /mo, as listed · 135 listings with a size |
| Projects within 4 km, counted | 92 (41 with an approximate location) | |
|---|---|---|
| Flats in them | 31,887 | |
| Booked | 18,362 of 31,887 (58%) | |
| Unsold | 13,525 | |
| Booked a month, pooled | 510 flats | |
| Months to sell, pooled | 23 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 2.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 872 m above sea level, plus or minus 4 m | |
| Metro, operational | 4.5 km, Nallur Halli | |
| Metro, under construction | 4.5 km, Kodibeesanahalli |
| Kempegowda Airport | 41.6 | 42 | 29.1 |
| MG Road (CBD) | 20.1 | 24 | 15.5 |
| Manyata Tech Park | 24.2 | 29 | 17.5 |
| ITPL, Whitefield | 8.3 | 10 | 5.2 |
| Ecospace, Bellandur ORR | 7.7 | 14 | 6.5 |
| Electronic City Ph 1 | 22.1 | 28 | 12.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 960 m to the south-west |