| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 6 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 6 pages.
Approvals
| Fire NOC | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date |
Disputes & cases
Builder: M/s.Arine Structures
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹75.00 Cr |
|---|
Loan & collateral
| Escrow bank | Karnataka Bank Ltd. · Bilekahalli |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Clear |
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Jul 2030 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Arine Golden Bells in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 1,544 sq m | |
|---|---|---|
| Title deed | Executed 19 Jan 2016 |
| 30 Apr 2022 |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vruksha Greens, price locked.
| Vruksha Greens | 1.1 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 4.5 km | Locked | |
| Rubby Castle 1 | about 5.5 km | Locked | |
| Sri Rama Enclave | about 7 km | Locked | |
| Shriram Solitaire | about 7.5 km | Locked | |
| Century Kindle Phase 1 | 8.5 km | Locked | |
| Renaissance Srichakra | about 9.5 km | Locked | |
| Birla Tisya | 9.8 km | Locked | |
| Vista Padmalaya | about 10 km | Locked | |
| Assetz Soho & Sky | 10.7 km | Locked | |
| 4square Park Sierra | 11.4 km | Locked | |
| Cumins Sanctum | about 11.5 km | Locked |
| Arine Golden Bells This project | This project is the point the others are measured from | 30 Apr 2022 | – | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 1.1 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 4.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 5.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Sri Rama Enclave | about 7 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Shriram Solitaire | about 7.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Century Kindle Phase 1 | 8.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Rent, 2BHK, 3 km | ₹16,350 /mo · 10 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹7,500 /mo · 7 listings | |
| Rent per sq ft, 3 km | ₹15.8 /mo, as listed · 9 listings with a size |
| Projects within 4 km, counted | 6 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 1,952 | |
| Booked | 1,544 of 1,952 (79%) | |
| Unsold | 408 | |
| Booked a month, pooled | 38 flats | |
| Months to sell, pooled | 11 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 200 m from the filed location | Clear |
| Nearest government-flagged flood location | 190 m, BAGALKUNTE( L NARSIMHAYA LAYOUT) |
| Nearest storm drain | 40 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 140 m to the south-east, an unnamed pond |
| RERA completion date | 30 Apr 2022 | Red flag |
|---|---|---|
| Work began, as filed | 30 Nov 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration |
|---|
| Escrow bank | Karnataka Bank Ltd. · Bilekahalli |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 130 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 40 m to the north-west, tertiary drain | |
|---|---|---|
| Ground level | 890 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.9 km, Manjunatha Nagar | |
| Metro, under construction | 9.9 km, Jakkur Cross |
| Kempegowda Airport | 35.4 | 40 | 26.6 |
| MG Road (CBD) | 18.8 | 23 | 14.7 |
| Manyata Tech Park | 16.3 | 21 | 13.0 |
| ITPL, Whitefield | 33.3 | 41 | 26.9 |
| Ecospace, Bellandur ORR | 32.4 | 41 | 24.8 |
| Electronic City Ph 1 | 50.9 | 40 | 31.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.3 km to the north-east, named Chikkabanavara 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 600 m to the south-east, named MEI Layout on OpenStreetMap |