| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 23 Jun 2025 · No. STRRPA/TP/LAO/15/2024-25/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹1.45 Cr 30.5%Development · ₹3.30 Cr 69.5%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 3 Jun 2025 | |
| Building plan | Sanctioned 23 Jun 2025 | |
| Escrow bank | ICICI Bank · HSR layout, Bangalore |
Data room
172 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Avalon County in the interactive atlas
Transfer of the land
Title deed executed
ಸರ್ಜಾಪುರ hobli
Title deed filed with K-RERA, p. 1 · See it in Documents
Approval or registration
Land use converted
Commissioner Office, Bangalore Urban Dist · Survey 131/3
K-RERA filing, land schedule
Approval or registration
Land use converted
Commissioner Office, Bangalore Urban Dist · Survey 1/1, 1/7, 1/8, 1/9 and 1 more
K-RERA filing, land schedule
Approval or registration
Land use converted
Commissioner Office, Bangalore Urban Dist · Survey 1/1, 1/7, 1/8, 1/9 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
1A 29G · Survey 11/1
K-RERA filing, land schedule
Approval or registration
Khata issued
2A 20G · Survey 131/3
K-RERA filing, land schedule
Approval or registration
Khata issued
7.5G · Survey 1/1, 1/7, 1/8, 1/9
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/LAO/15/2024-25/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/180925/008099
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 3 Jun 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 4 of the survey sketch. Filed with K-RERA: Sy Sketch 131 3, 4 pages, not in English.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 33,215 sq m | |
| Extent the filed land schedule names for these survey numbers | 17,098 sq m | |
| Plot area against the filed extent | 1.94 times | |
| Village, hobli and taluk on the KGIS map | Matnahalli, Sarjapura-1 hobli, Anekal taluk | |
| Sy. 11/1: filed extent, KGIS plot | 6,981 sq m, 6,843 sq m | |
| Sy. 131/3: filed extent, KGIS plot | 10,117 sq m, 10,758 sq m | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 1/1, 1/7, 1/8, 1/9, 11/1, 131/3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 33,215 sq m (the project holds a share) | |
| Khata | 7.5G · 1 Jun 2025; 1A 29G · 1 Jun 2025; 2A 20G · 1 Jun 2025 |
| Sy. No. 1/1 | 1 | 28 guntas | 0 | |||||
| Sy. No. 1/7 | Not read yet | 0 | ||||||
| Sy. No. 1/8 | Not read yet | 0 | ||||||
| Sy. No. 1/9 | Not read yet |
| SEIAA |
|---|
| Filed with the registration |
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 1/1, 1/7, 1/8, 1/9, 11/1 | Converted 5 Mar 2024 · Commissioner Office, Bangalore Urban Dist | |
| Sy 131/3 | Converted 10 Jul 2023 · Commissioner Office, Bangalore Urban Dist | |
| Survey numbers | 1/1 · 1/7 · 1/8 · 1/9 · 11/1 · 131/3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Plots in them | 2,754 | |
| Booked | 1,193 of 2,754 (43%) | |
| Unsold | 1,561 | |
| Booked a month, pooled | 28 plots | |
| Months to sell, pooled | 50 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 11.5 km, Varthur police station | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
As the promoter reported itPossession date in the agreement

| Completion | 100% | |
|---|---|---|
| Completion, accountant | 89.5% of the estimated cost spent |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 15 Aug 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Engineer's certificate, registration | Dated 24 Jun 2025 |
| Estimated cost, at registration | ₹4.75 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.90 Cr | |
| Cost incurred | ₹4.25 Cr (89.5% of the estimate) | |
| Cost left | ₹50.1 L |
| Escrow bank | ICICI Bank · HSR layout, Bangalore | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 11/1 | Not read yet | 1 acre 29 guntas | 1 acre 28 guntas | Yes | 0 |
| Sy. No. 131/3 | 0 | 2 acres 20 guntas | 2 acres 26 guntas | Differs: 6 guntas apart | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 15 km, Channasandra | |
| Metro, under construction | about 16 km, Kodibeesanahalli |
| Kempegowda Airport | 55 | 38.5 |
| MG Road (CBD) | 33.5 | 27 |
| Manyata Tech Park | 38 | 29.5 |
| ITPL, Whitefield | 22 | 16 |
| Ecospace, Bellandur ORR | 24.5 | 17 |
| Electronic City Ph 1 | 31 | 17 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |