Overview
Construction Of 34 Dus Pkgby For Powrakarmika
Overview
Construction Of 34 Dus Pkgby For Powrakarmika
Overview
Construction Of 34 Dus Pkgby For Powrakarmika
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaApplied for completion 15/11/2026 | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity HarmonyCompleted · OC 01-09-2018 | AFFINITY PROJECTS | Apartment | 1,414 sqft carpet (as filed) | Completed |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 982–1,237 sqft carpet (as filed) |
| Sep 2027 |
| Affinity SerenityLapsed · completion date passed | Sudhakara Reddy Annem | Apartment | – | Feb 2022 |
| Alpine Pyramid EfghCompleted (regulator flag) | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 1,066 sqft carpet (as filed) | Completed |
8 of 100 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Construction Of 34 Dus Pkgby For Powrakarmika in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Flats in them | 201 |
|---|
| Booked | 91 of 201 (45%) |
|---|
| Unsold | 110 |
|---|
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 21.5 km, Attur, Near Dairy Circle |
|---|
| Nearest storm drain | about 2 km to the south, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 31.2 m
Taluk average; not a reading at the site.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 0 of 3 CGWB wells in Doddaballapura taluk read in this class | |
| Through the year | January 2024: 3.7 m (3 wells), Pre-monsoon 2024: 5.6 m (3 wells), August 2024: 5.5 m (2 wells), depth below ground of CGWB's monitoring wells in Doddaballapura taluk (the median where there are several) |
| Landfill or waste transfer station | None within 3 km |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km to the south, primary drain | |
|---|---|---|
| Metro, operational | about 27.5 km, Madavara | |
| Metro, under construction | about 17 km, Doddajala |
| Kempegowda Airport | 33.5 | 21.5 |
| MG Road (CBD) | 42.5 | 36.5 |
| Manyata Tech Park | 35.5 | 29.5 |
| ITPL, Whitefield | 65 | 41 |
| Ecospace, Bellandur ORR | 58 | 44.5 |
| Electronic City Ph 1 | 62 | 53.5 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km |
|---|