Overview
Def Col
Overview
Def Col
Overview
Def Col
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Airport height NOC | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body |
Construction & progress
Developer
Land · ₹5.50 Cr
Loan & collateral
| Escrow bank | HDFC · HUNSMARANAHALLI |
|---|
Data room
53 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Def Col is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 19,829 sq m | |
|---|---|---|
| Sale deed | 9 Dec 2016 | |
| Title deed | Executed 9 Dec 2016 · No. DNH-1-08669-2016-17 · Book 1 · Consideration ₹1.54 Cr | |
| Title deed | Executed 9 Dec 2016 · Consideration ₹1.54 Cr · Sy 5/3 | |
| Title deed | Executed 9 Dec 2016 · Consideration ₹1.57 Cr · Sy 5/2, Vijayapura hobli, Devanahalli taluk · 1 Acre 26 Guntas |
| RERA extensions | Granted · Approved 22 Jun 2022 | |
|---|---|---|
| RERA completion date | 30 Sep 2021 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Water supply, as filed | Self development |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, secondary drain |
|---|
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 2.5 km from the locality centre, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1.5 km from the locality centre |
| RERA completion date | 30 Sep 2021 | Red flag |
|---|---|---|
| Work began, as filed | 1 Jul 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 22 Jul 2022 · site inspected 11 Jul 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 22 Jul 2022 | |
| Chartered accountant's certificate, registration | Dated 19 Dec 2022 |
| Estimated cost, at registration | ₹12.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹4.00 Cr |
| Escrow bank | HDFC · HUNSMARANAHALLI |
|---|
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors