Overview
ELDECO LIVE BY THE GREENS (PHASE I)
WONDROUS BUILDMART PRIVATE LIMITED · Gautam Buddha Nagar
Units575
Completion2025-06-30Revised · Proposed 2024-12-31
Registered on2018-02-12
Valid to2025-06-30
Approvals3
Complaints18As of 2026-10-29
Sections
| Property title & search report | |
|---|---|
| Approvals | 3 approvals |
| Disputes & cases | 18 project complaints · 27 promoter complaints |
| Contract & costs | 1 cost head |
| Technical report | |
| Site & area | 4 site details · 180 unit types |
| Construction & progress | 3 progress details · 21 quarters · 1 extension |
| Developer & finance | |
| Developer | 4 developer details |
| The evidence | |
| Sources | 78 documents · 28 source links |
Registration
Registration
| Promoter | WONDROUS BUILDMART PRIVATE LIMITED | |
|---|---|---|
| District | Gautam Buddha Nagar | |
| Regulator | UP RERA | |
| Registration number | UPRERAPRJ15172 | |
| Registered on | 2018-02-12 | |
| Valid to | 2025-06-30 | |
| Project type | Residential | |
| Status (as filed) | Registered Projects | |
| Proposed completion | 2024-12-31 | |
| Revised completion | 2025-06-30 |
Approvals
Is it approved for its use?
Approvals
Approvals
| Approval | Number | Date | Valid to | Authority |
|---|---|---|---|---|
| Original permit | 2017/IV-1508/967 | 2017-03-10 | 2022-03-09 | Noida Authority |
| Original permit | 2017/IV-1508/967 | 2017-03-10 | 2022-03-09 | Noida Authority |
| Revalidated permit | 2017/IV-1508/967 | 2017-03-10 | Noida Authority |
Disputes & cases
Are there court cases or buyer complaints on this project?
Disputes & cases
Complaints & cases
| Project complaints | 18 | |
|---|---|---|
| Promoter | 27 | |
| As of | 2026-10-29 |
Contract & costs
What does a buyer commit to?
Contract & costs
Project costs
| Total | ₹2,56,92,00,000 |
|---|
Site & area
What does the land measure?
Site & area
Site & area
| Land area (m²) | 24,112 | |
|---|---|---|
| Towers | 6 | |
| Maximum floors | 22 | |
| Units | 575 |
Unit types
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 1 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 1 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 2 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 2 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 3 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 3 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 4 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 4 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 5 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 5 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 6 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 6 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 7 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 7 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 8 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 8 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 9 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 9 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 10 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 10 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 11 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 11 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 12 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 12 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 13 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 13 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 14 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 14 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 15 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 15 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 16 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 16 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 17 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 17 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 18 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 18 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 19 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 19 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 20 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 20 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 21 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 21 |
| 2 BHK | 62.08 | 4 | LIFE-1 (Type-A) | 22 |
| 2 BHK | 62.83 | 1 | LIFE-1 (Type-A) | 22 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 1 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 1 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 2 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 2 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 3 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 3 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 4 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 4 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 5 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 5 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 6 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 6 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 7 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 7 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 8 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 9 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 9 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 10 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 10 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 11 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 11 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 12 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 12 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 13 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 13 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 14 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 14 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 15 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 15 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 16 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 16 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 17 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 17 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 18 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 18 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 19 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 19 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 20 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 20 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 21 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 21 |
| 2 BHK | 62.08 | 4 | LIFE-2 (Type-A) | 22 |
| 2 BHK | 62.83 | 1 | LIFE-2 (Type-A) | 22 |
| 3 BHK | 76.9 | 2 | VERVE-1 (Type-B) | GF |
| 3 BHK | 76.9 | 2 | VERVE-1 (Type-B) | 1 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 2 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 3 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 4 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 5 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 6 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 7 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 8 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 8 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 9 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 10 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 11 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 12 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 13 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 14 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 15 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 16 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 17 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 18 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 19 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 20 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 21 |
| 3 BHK | 76.9 | 4 | VERVE-1 (Type-B) | 22 |
| 3 BHK | 76.9 | 2 | VERVE-2 (Type-B) | GF |
| 3 BHK | 76.9 | 2 | VERVE-2 (Type-B) | 1 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 2 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 3 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 4 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 5 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 6 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 7 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 8 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 9 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 10 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 11 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 12 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 13 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 14 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 15 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 16 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 17 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 18 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 19 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 20 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 21 |
| 3 BHK | 76.9 | 4 | VERVE-2 (Type-B) | 22 |
| 3 BHK | 76.9 | 2 | VERVE-3 (Type-B) | GF |
| 3 BHK | 76.9 | 2 | VERVE-3 (Type-B) | 1 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 2 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 3 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 4 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 5 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 6 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 7 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 8 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 9 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 10 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 11 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 12 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 13 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 14 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 15 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 16 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 17 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 18 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 19 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 20 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 21 |
| 3 BHK | 76.9 | 4 | VERVE-3 (Type-B) | 22 |
| 3 BHK | 76.9 | 2 | VERVE-4 (Type-B) | GF |
| 3 BHK | 76.9 | 2 | VERVE-4 (Type-B) | 1 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 2 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 3 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 4 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 5 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 6 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 7 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 8 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 9 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 10 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 11 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 12 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 13 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 14 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 15 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 16 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 17 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 18 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 19 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 20 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 21 |
| 3 BHK | 76.9 | 4 | VERVE-4 (Type-B) | 22 |
Construction & progress
How is it being built, and when will it be ready?
Construction & progress
Progress
| Start | 2018-01-01 | |
|---|---|---|
| Proposed completion | 2024-12-31 | |
| Revised completion | 2025-06-30 |
Quarterly progress
| Quarter |
|---|
| 2020-Q2 |
| 2020-Q3 |
| 2020-Q4 |
| 2021-Q1 |
| 2021-Q2 |
| 2021-Q3 |
| 2021-Q4 |
| 2022-Q1 |
| 2022-Q2 |
| 2022-Q3 |
| 2022-Q4 |
| 2023-Q1 |
| 2023-Q2 |
| 2023-Q3 |
| 2023-Q4 |
| 2024-Q1 |
| 2024-Q2 |
| 2024-Q3 |
| 2024-Q4 |
| 2025-Q1 |
| 2025-Q2 |
Extensions
| Valid to | Reason |
|---|---|
| 2025-06-30 | Six months extension in view of force majeure caused by covid-19 pandemic |
Developer
Can the developer deliver?
Developer
Promoter
| Promoter | WONDROUS BUILDMART PRIVATE LIMITED | |
|---|---|---|
| Type | Company | |
| Escrow bank | HDFC BANK LIMITED | |
| Other projects in this city pack | 2 |
Sources
Sources
Source URLs & documents
- https://up-rera.in/Projectsummary?UI0aPA1ISD=s0FxmCZ68Mc=&hfFlag=9emr4VdBw22M7BGjKtJWMPDI4s5cHQZP&NPJ6RAme=bBTmfoRdzTIql0jxAc5YrbUg8SDM67Q/vf5W230DrQesZiu6ruLoIw==&PaURJEMAN4=ZL9MNERkNdZHyqCyu8wvcw==&IRSAHEB=D6PY3lyims8=
- https://up-rera.in/QPRDOCS
- https://up-rera.in/WebService1.asmx/loadApartmentTransaction_ForViewProject
- https://up-rera.in/frm_allprojectdistrictwise.aspx?districtname=GAUTAM%20BUDDHA%20NAGAR
- https://up-rera.in/projects
- https://up-rera.in/viewprojects
- https://up-rera.in/viewtarget.aspx?id=s0FxmCZ68Mc=
- Commencement Certificate · 2018-07-06
- Other Plan(If Any) · 2018-07-06
- CA CERTIFICATE · 2018-07-06 · Sign in to download
- ARCHITECT CERTIFICATE · 2018-07-18 · Sign in to download
- ENGINEERS CERTIFICATE · 2018-07-18 · Sign in to download
- Document
- Sanctioned Layout Plan (Of Entire Project) · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Floor plans of all types · 2018-02-12
- Other Plan(If Any) · 2018-02-12
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- Chartered Accountant Certificate
- Architect Certificate
- Structural Engineer Certificate
- 2020-Q2
- 2020-Q3
- 2020-Q4
- 2021-Q1
- 2021-Q2
- 2021-Q3
- 2021-Q4
- 2022-Q1
- 2022-Q2
- 2022-Q3
- 2022-Q4
- 2023-Q1
- 2023-Q2
- 2023-Q3
- 2023-Q4
- 2024-Q1
- 2024-Q2
- 2024-Q3
- 2024-Q4
- 2025-Q1
- 2025-Q2