Overview
Elv Kingsland
Overview
Elv Kingsland
Overview
Elv Kingsland
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page.
Approvals
| Power NOC | Filed with the registration |
|---|
| RERA extensions |
|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹57.75 Cr |
|---|
Loan & collateral
| Escrow bank | Canara Bank · Marathahalli |
|---|
Data room
54 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Elv Kingsland in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 9,105 sq m |
|---|
| RERA completion date | 30 Aug 2024 |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Reflections 66, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Garuda Grand, price locked; Poetry Of Earth, price locked.
| Reflections 66 | 490 m | Locked | |
|---|---|---|---|
| Coevolve Misty Shores | about 1 km | Locked | |
| Axis Ekatva | about 1 km | Locked | |
| Assetz 66 & Shibui | about 1 km | Locked | |
| Vaswani Starlight | about 1 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.7 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 3.1 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 3.1 km | Locked | |
| Vintage Valley | about 3.5 km | Locked | |
| Inspira Infinity | about 3.5 km | Locked | |
| Garuda Grand | 3.7 km | Locked | |
| Poetry Of Earth | 3.8 km | Locked |
| Elv Kingsland This project | This project is the point the others are measured from | 30 Aug 2024 | – | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | 490 m | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Coevolve Misty Shores | about 1 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Axis Ekatva | about 1 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Vaswani Starlight | about 1 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.7 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 13 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 102 listings | |
| Rent, 2BHK, 3 km | ₹37,500 /mo · 128 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 122 listings | |
| Rent per sq ft, 3 km | ₹36.9 /mo, as listed · 175 listings with a size |
| Projects within 4 km, counted | 81 (40 with an approximate location) | |
|---|---|---|
| Flats in them | 22,760 | |
| Booked | 13,215 of 22,760 (58%) | |
| Unsold | 9,545 | |
| Booked a month, pooled | 354 flats | |
| Months to sell, pooled | 24 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 540 m, Nellurahalli |
| Nearest storm drain | 60 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 310 m to the west, an unnamed water body |
| Schedule end | 31 Mar 2021 | |
|---|---|---|
| RERA completion date | 30 Aug 2024 | Red flag |
| Work began, as filed | 4 Jul 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | Canara Bank · Marathahalli |
|---|
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 5 | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 940 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 60 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 873 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.8 km, Kadugodi | |
| Metro, under construction | 4.4 km, ISRO |
| Kempegowda Airport | 38.0 | 39 | 25.6 |
| MG Road (CBD) | 18.3 | 23 | 15.2 |
| Manyata Tech Park | 19.5 | 27 | 15.5 |
| ITPL, Whitefield | 4.8 | 7 | 1.7 |
| Ecospace, Bellandur ORR | 10.8 | 16 | 8.3 |
| Electronic City Ph 1 | 25.4 | 32 | 16.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the north, named ITPL on OpenStreetMap |