Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
167 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 465 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Garden Breeze @ The Prestige City in the interactive atlas
Covers 100/3 only
Transfer of the land
Sale deed
Survey 100/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 99/2, 99/3, 100/5
K-RERA filing, land schedule
Covers 100/5 only
Transfer of the land
Sale deed
Survey 99/2, 99/3, 100/5
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 99/2, 99/3, 100/3, 100/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 99/2, 99/3, 100/3, 100/4 and 1 more
K-RERA filing, land schedule
Covers 99/2 only
Approval or registration
Khata issued
E Khatha · Yamare Grama Panchayath · Survey 99/2, 100/3, 100/4, 100/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Yamare Grama Panchayath · Survey 99/2, 100/3, 100/4, 100/5
K-RERA filing, land schedule
Covers 100/4 only
Transfer of the land
Sale deed
Survey 100/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan 551/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/080926/008919
K-RERA registration ·
Covers 99/3 only
Approval or registration
Khata issued
E Khatha · Yamare Grama Panchayath · Survey 99/3
K-RERA filing, land schedule
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 99/2 (Old No.99), 99/3 (Old No.99,then 99/1), 100/3 (earlier Portion of Sy N, 100/4 (earlier Portion of Sy N, 100/5 (earlier portion of Sy N | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 40,468 sq m | |
| Khata | E Khatha · Yamare Grama Panchayath · 25 Sep 2025; E Khatha · Yamare Grama Panchayath · 25 Sep 2026 | |
| Sale deed | Dated 1 Oct 2014, 4 Jun 2015, 29 Sep 2025 | |
| Building plan (Anekal Planning Authority) | Sanctioned 14 Aug 2026 · No. 551/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| Clearances pending | 1, in the latest update | Review |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2030 |
| Land conversion | Converted 6 May 2017 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 99/2 (Old No.99) · 99/3 (Old No.99,then 99/1) · 100/3 (earlier Portion of Sy N · 100/4 (earlier Portion of Sy N · 100/5 (earlier portion of Sy N |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 93 m² 63.1%2BHK · avg 66 m² 36.5%4BHK 0.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 239 | 1,68,918 |
| 3BHK | 413 | 4,11,343 |
| 4BHK | 3 | 5,210 |
| Sold, Q2 2026-27 | 490 / 655 | |
|---|---|---|
| Unsold, Q2 2026-27 | 165 |
| Leafy Avenue | about 2 km | Locked | |
|---|---|---|---|
| Coevolve Florenza | about 2 km | Locked | |
| Vasudharini Nest | about 2 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 2 km | Locked | |
| Suyug's Saffron | about 3 km |
| Garden Breeze @ The Prestige City This project | This project is the point the others are measured from | 30 Nov 2030 | 75% (490 of 655) | Not verified yet |
|---|---|---|---|---|
| Leafy Avenue | about 2 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
| Coevolve Florenza | about 2 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
| Vasudharini Nest |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7.5 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.36 (891 covered spaces for 655 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km |
|---|
| Main structure | Not started · planned by 15 Jun 2030 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Oct 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 2% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Nov 2030 | |
| RERA completion date | 30 Nov 2030 | |
| Work began, as filed | 1 Sep 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Tower 1 85.85 m, Tower 2 95 m, Tower 3 95 m, Tower 4 95 m | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 100 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 | |
Land · ₹348.87 Cr 37.6%Development · ₹578.82 Cr 62.4%
| Estimated cost | ₹927.70 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (490) 74.8%Unsold (165) 25.2%
| Sold, Q2 2026-27 | 490 / 655 · 165 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 165 |
| Escrow bank | ICICI Bank · MG Road Bangalore | |
|---|---|---|
| Designated account, collected | ₹28.63 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹27.50 Cr in Q2 2026-27 (96% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 52 | |
|---|---|---|
| Marked completed | 29 | |
| Past promised date, not completed | 8 | |
| Complaints filed against the promoter | 16 | |
| Other phases under this promoter name | 11 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 2 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 14 Aug 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · MG Road Bangalore | |
| Royal Nest | about 3 km | Locked |
|---|
| Sowparnika Olivia Nest | about 3 km | Locked |
|---|
| Nambiar District 25 Phase 2 | about 3.5 km | Locked |
|---|
| Engrace Vista | about 3.5 km | Locked |
|---|
| Engrace 4 | about 4 km | Locked |
|---|
| Engrace 3 | about 4 km | Locked |
|---|
| Leafy Delight | about 4.5 km | Locked |
|---|
| about 2 km |
| 31 Mar 2028 |
| 31% (26 of 84) |
| Locked |
| Bilva Phase-II By Bhavisha Homes | about 2 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Suyug's Saffron | about 3 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
|---|
| Royal Nest | about 3 km | 30 Jun 2028 | 9% (9 of 104) | Locked |
|---|
| Projects within 4 km, counted | 66 (66 with an approximate location) | |
|---|---|---|
| Flats in them | 15,682 | |
| Booked | 8,425 of 15,682 (54%) | |
| Unsold | 7,257 | |
| Booked a month, pooled | 218 flats | |
| Months to sell, pooled | 27 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 12 km, Kodibeesanahalli | |
| Kempegowda Airport | 36.5 |
| MG Road (CBD) | 23 |
| Manyata Tech Park | 26 |
| ITPL, Whitefield | 13 |
| Ecospace, Bellandur ORR | 12.5 |
| Electronic City Ph 1 | 13 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2.5 km to the south, named Sarjapur Substation on OpenStreetMap |
|---|