Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Title deed executed
Consideration ₹1.7 L · Sy 66, Bidarahalli hobli · 1 Acre 4 Guntas
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 4 May 2022 | |
| Escrow bank | Axis Bank · MG Road Bangalore |
Data room
309 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 5 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 3 sections
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Godrej Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Splendour Phase II in the interactive atlas
Transfer of the land
Title deed executed
Sy 107/1, Bidarahalli hobli
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Approval or registration
Land use converted
District Commissioner · Survey 46/1, 46/2, 46/3, 46/4, 46/5
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹1.22 Cr · Sy 46/3, Dommasandra village, Bidarahalli hobli, Bengaluru East taluk · 21 Guntas
Title deed filed with K-RERA, pp. 1, 11, 31 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.27 Cr · Sy 107/2, Kumbena Agrahara village, Bidarahalli hobli, Bengaluru East taluk · 1 Acre
Title deed filed with K-RERA, pp. 1, 11, 29 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.53 Cr · Sy 107/2, Kumbena Agrahara village, Bengaluru East taluk
Title deed filed with K-RERA, pp. 1, 9, 27 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.20 Cr · Sy 46/1, Bidarahalli hobli, Bengaluru East taluk · 21 Guntas
Title deed filed with K-RERA, pp. 1, 9, 27 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.31 Cr · Sy 46/5, Bidarahalli hobli, Bengaluru East taluk · 21 Guntas
Title deed filed with K-RERA, pp. 1, 9, 27 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.32 Cr · Sy 46/2, Dommasandra village, Bidarahalli hobli, Bengaluru East taluk · 21 Guntas
Title deed filed with K-RERA, pp. 1, 7, 27 · See it in Documents
Transfer of the land
Title deed executed
Sy 46/2; Sy 46/4; and 6 more items
Title deed filed with K-RERA, pp. 1, 52, 53, 54, 55 · See it in Documents
Transfer of the land
Sale deed
in favour of Godrej Properties Limited · Survey 46/1, 46/2, 46/3, 46/4, 46/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/DLP-33/2018-19/252/2019- 20
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 46/1, 46/2, 46/3, 46/4, 46/5
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/120123/005611
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title report dated | 28 Apr 2021 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: EC Transfer Order, 2 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 46/1, 46/2, 46/3, 46/4, 46/5, | |
|---|---|---|
| Land extent, Sy 46/1, 46/2, 46/3, 46/4, 46/5, | 17 Acres 30.50 Guntas | |
| Land area of this registration | 30,135 sq m | |
| Khata | E Khatha · Panchayat · 15 Nov 2022 | |
| Sale deed | Dated 12 Jul 2021 | |
| Sale deed in favour of | Godrej Properties Limited |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 4 May 2022 · No. BDA/TPM/DLP-33/2018-19/252/2019- 20 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/136/2021 · issued 5 Aug 2021 · building height 87.3 m (WING K, WING L, WING M, WING Q, WING R, WING S, WING T), 84.35 m (WING N, WING P) | Clear |
| Environmental clearance (1 of 3) | SEIAA 116 CON 2019 · issued 3 Sep 2021 | Clear |
| Environmental clearance (2 of 3) | issued 18 Nov 2019 | |
| Environmental clearance (3 of 3) | SEIAA 116 CON 2019 · issued 18 Nov 2019 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/071121/560208 · issued 16 Jul 2021 · valid until 15 Jul 2029 | Clear |
| Pollution board (CFE) | consent order CTE-334496 · issued 22 Nov 2022 · valid until 21 Nov 2027 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 14 Jan 2028 |
| Land conversion | Converted 1 Aug 2016 · District Commissioner | |
|---|---|---|
| Survey numbers | 46/1, 46/2, 46/3, 46/4, 46/5, |
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, SAI BABA ASHRAM KADUGODI |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · Power Backup | |
|---|---|---|
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Covered parking per unit | 1.38 (1,229 covered spaces for 891 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 54% · planned by 27 Sep 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 8% · planned by 15 May 2027 | |
| Completion | 35% | |
| Completion, accountant | 58.3% of the estimated cost spent |
| Schedule end | 15 Dec 2027 | |
|---|---|---|
| RERA completion date | 14 Jan 2028 | |
| Work began, as filed | 15 Jan 2023 |
| Building heights, fire NOC | 87.3 m (WING K, WING L, WING M, WING Q, WING R, WING S, WING T), 84.35 m (WING N, WING P) on the fire NOC · filed: WING K 67 m, WING L 67 m, WING M 67 m, WING N 64 m, WING P 64 m, WING Q 67 m, WING R 67 m, WING S 67 m, WING T 67 m |
|---|
| Power backup | Provided, 177 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/136/2021 · issued 5 Aug 2021 · building height 87.3 m (WING K, WING L, WING M, WING Q, WING R, WING S, WING T), 84.35 m (WING N, WING P) | |
| Environmental clearance (1 of 3) | SEIAA 116 CON 2019 · issued 3 Sep 2021 | |
| Environmental clearance (2 of 3) | issued 18 Nov 2019 | |
| Environmental clearance (3 of 3) | SEIAA 116 CON 2019 · issued 18 Nov 2019 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 11 Nov 2022 | |
| Architect's quarterly progress certificate | 34.69% complete per the architect, as of 30 Sep 2026 | |
| Architect's quarterly progress certificate dated | 30 Sep 2026 | |
| Architect's site inspection for the quarterly progress certificate | 30 Sep 2026 |
Land · ₹106.25 Cr 16%Development · ₹556.08 Cr 84%
| Estimated cost, at registration | ₹662.33 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹556.10 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹686.28 Cr | |
| Cost incurred | ₹400.10 Cr (58.3% of the Form 4 Q2 2026-27 estimate) |
Sold (782) 87.8%Unsold (109) 12.2%
| Sold, Q3 2025-26 | 781 / 891 · 110 available | |
|---|---|---|
| Sold, Q4 2025-26 | 795 / 891 · 96 available | |
| Sold, Q1 2026-27 | 781 / 891 · 110 available | |
| Sold, Q2 2026-27 | 782 / 891 · 109 available | |
| Unsold, Q2 2026-27 | 109 | |
| Sold in Q4 2025-26 | 14 | |
| Sold in Q1 2026-27 | 14 bookings cancelled or corrected (795 → 781 sold) | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | Axis Bank · MG Road Bangalore | |
|---|---|---|
| Designated account, collected | ₹1.87 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹12.18 Cr in Q2 2026-27 |
| K-RERA registrations under this promoter | 16 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority (Shegehalli Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Whitefield | |
| Metro, under construction | about 6.5 km, DRDO Sports complex |
| Kempegowda Airport | 34.5 | 21 |
| MG Road (CBD) | 19 | 16 |
| Manyata Tech Park | 18.5 | 14 |
| ITPL, Whitefield | 6 | 3 |
| Ecospace, Bellandur ORR | 17 | 12 |
| Electronic City Ph 1 | 30.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the west, named Yelemallappa Chetti 15MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |