Overview
Good Earth Cadence
Overview
Good Earth Cadence
Overview
Good Earth Cadence
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 5 Nov 2024 · No. BDA/AS/AA-3/TS-2/D/11/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 29 Nov 2024 | |
| Building plan (BDA) | Sanctioned 5 Nov 2024 | |
| Escrow bank | HDFC · Richmond road |
Data room
120 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 3 sections
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
All 126 projects in Mysore Road → · Good Earth Eco Communities Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Good Earth Cadence in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner, Bangalore Urban District · Survey 39
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. KEN-1-02806-2023-24 · Book 1 · Consideration ₹6.72 Cr · Sy 39, Kambipura village, Kengeri hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 4, 8, 14 · See it in Documents
Transfer of the land
Sale deed
in favour of GOOD EARTH ECO COMMUNITIES PVT LTD · Survey 39
K-RERA filing, land schedule
Approval or registration
Land use converted
Special Deputy Commissioner, Bangalore Urban District · Survey 230/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. KEN-1-06425-2023-24 · Book 1 · executed 23 Nov 2023 · Consideration ₹2.85 Cr · Sy 230/2, Kambipura village, Kengeri hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 4, 9, 15 · See it in Documents
Transfer of the land
Sale deed
in favour of GOOD EARTH ECO COMMUNITIES PVT LTD · Survey 230/2
K-RERA filing, land schedule
Approval or registration
Land use converted
Special Deputy Commissioner, Bangalore Urban District · Survey 231/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. KEN-1-01115-2024-25 · Book 1 · executed 6 May 2024 · Consideration ₹11.56 Cr · Sy 231, Kambipura village, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 4, 9, 15 · See it in Documents
Transfer of the land
Sale deed
in favour of GOOD EARTH ECO COMMUNITIES PVT LTD · Survey 231/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAM PANCHAYATH, KUMBALAGODU · Survey 39, 230/2, 231/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAM PANCHAYATH, KUMBALAGODU · Survey 39, 230/2, 231/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAM PANCHAYATH, KUMBALAGODU · Survey 39, 230/2, 231/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/AS/AA-3/TS-2/D/11/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/070125/007359
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 29 Nov 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: Conversion Sketch - Sy No 231-2.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 41,942 sq m | |
| Extent the filed land schedule names for these survey numbers | 13,682 sq m | |
| Plot area against the filed extent | 3.07 times | |
| Land area filed with K-RERA | 14,896 sq m | |
| Village, hobli and taluk on the KGIS map | K.G.Kambipura, KENGERI - 2 hobli, BANGALORE-SOUTH taluk | |
| Sy. 39: filed extent, KGIS plot | 4,350 sq m, 4,310 sq m | |
| Sy. 230/2: filed extent, KGIS plot | 1,845 sq m, 12,717 sq m | |
| Sy. 231/2: filed extent, KGIS plot | 7,487 sq m, 24,915 sq m | |
| Mutation entry | None open on 3 of 3 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 39, 230/2, 231/2 | |
|---|---|---|
| Land extent, Sy 39 | 1 Acres 03 Guntas | |
| Land extent, Sy 230/2 | 18.24 Guntas | |
| Land extent, Sy 231/2 | 1 Acres 34 Guntas | |
| Whole survey numbers on the KGIS map | 41,942 sq m (the project holds a share) | |
| Land area of this registration | 14,896 sq m | |
| Khata | E Khatha · GRAM PANCHAYATH, KUMBALAGODU · 25 Jul 2024 | |
| Sale deed | Dated 13 Jul 2023, 24 Nov 2023, 6 May 2024 | |
| Sale deed in favour of | GOOD EARTH ECO COMMUNITIES PVT LTD |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 39 | 2 | 1 acre 3 guntas | 1 acre 3 guntas | 1 acre 3 guntas | Yes | 0 | ||
| Sy. No. 230/2 | 2 | 3 acres 16 guntas | 18 guntas | 3 acres 6 guntas | Differs: 2 acres 38 guntas apart | 0 | ||
| Sy. No. 231/2 | 2 | 1 acre 34 guntas | 1 acre 34 guntas | 6 acres 6 guntas |
| Environmental clearance | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 39 | Converted 27 Jun 2023 · Special Deputy Commissioner, Bangalore Urban District | |
| Sy 230/2 | Converted 13 Sep 2023 · Special Deputy Commissioner, Bangalore Urban District | |
| Sy 231/2 | Converted 11 Mar 2024 · Special Deputy Commissioner, Bangalore Urban District | |
| Survey numbers | 39 · 230/2 · 231/2 |
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 2.9 km, Kengeri Yellamma temple | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 1.0 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the south, an unnamed water body |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.52 (220 covered spaces for 145 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 20% · planned by 15 May 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Apr 2028 | |
| Completion | 10% | |
| Completion, accountant | 15% of the estimated cost spent |
| Schedule end | 31 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Feb 2025 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 20 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Site inspected 23 Nov 2024 | |
| Engineer's certificate, registration | Dated 9 Dec 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹22.61 Cr 7.1%Development · ₹297.51 Cr 92.9%
| Estimated cost, at registration | ₹320.12 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹145.15 Cr | |
| Cost incurred | ₹47.99 Cr (15% of the estimate) | |
| Cost left | ₹272.14 Cr | |
| Receivable, sold flats | ₹183.43 Cr |
Sold (104) 71.7%Unsold (41) 28.3%
| Sold, Q3 2025-26 | 92 / 145 · 53 available | |
|---|---|---|
| Sold, Q4 2025-26 | 100 / 145 · 45 available | |
| Sold, Q1 2026-27 | 104 / 145 · 41 available | |
| Unsold, Q1 2026-27 | 41 | |
| Sold in Q4 2025-26 | 8 | |
| Sold in Q1 2026-27 | 4 |
| Escrow bank | HDFC · Richmond road | |
|---|---|---|
| Designated account, collected | ₹12.80 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹9.82 Cr in Q1 2026-27 (77% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| The map differs by 4 acres 12 guntas |
| 0 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 2.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.0 km to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 770 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.8 km, Challaghatta | |
| Metro, under construction | 14.3 km, Kalena Agrahara |
| Kempegowda Airport | 54.5 | 58 | 44.1 |
| MG Road (CBD) | 21.7 | 27 | 18.3 |
| Manyata Tech Park | 32.0 | 37 | 24.9 |
| ITPL, Whitefield | 38.9 | 45 | 31.9 |
| Ecospace, Bellandur ORR | 35.5 | 38 | 24.1 |
| Electronic City Ph 1 | 32.3 | 28 | 23.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.7 km to the north-west, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the east, named Provident Sunworth Substation on OpenStreetMap |