Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC Bengaluru · Survey 63/1
K-RERA filing, land schedule
Approvals
| Building plan (BDA) | Sanctioned 7 Feb 2023 · No. BDA/TPM/PRL-18/2022/23- 3104/2022/23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹21.70 Cr 83.4%Development · ₹4.33 Cr 16.6%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 7 Feb 2023 | |
| Escrow bank | IDFC FIRST BANK · Basavanagudi Branch |
Data room
131 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 100 TreesCompleted · OC 08-06-2021 | ADIGA PROPERTY DEVELOPERS | Apartment | – | Completed |
| Akshaya RegaliaCompleted (regulator flag) | AKSHAYA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| Anitha RegencyLapsed · completion date passed | SHAKTHI INFRASTRUCTURE | Apartment | 794 sqft carpet (as filed) | Mar 2024 |
| Anu GreensLapsed · completion date passed | Jyothi P | Plot | ~1,200–1,670 sqft (estimate: filed carpet plus 25%) | Jun 2024 |
| Arkha SanctuaryCompleted (regulator flag) | ARKHA DEVELOPERS | Apartment | 793–945 sqft carpet (as filed) | Completed |
| Casper ValleyRegistered · no quarterly update yet | AURA WAVE ESTATES LLP | Plot | ~1,060–2,000 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
| Century CentralCompleted (regulator flag) | Century joint Development Private Limited | Mixed development | – | Completed |
| Comfot HeightsLapsed · completion date passed | Comfort Builders and Developers | Apartment | 1,015 sqft carpet (as filed) | Oct 2020 |
8 of 65 other projects in Uttarahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Earth Phase-I in the interactive atlas
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-18/2022/23- 3104/2022/23
K-RERA filing, approvals
Transfer of the land
Sale deed
in favour of Annragh International LLP · Survey 63/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 63/1
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/080823/006132
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,24,555 sq m | |
| Extent the filed land schedule names for these survey numbers | 12,545 sq m | |
| Plot area against the filed extent | 9.93 times | |
| Village, hobli and taluk on the KGIS map | Kengeri, KENGERI - 1 hobli, BANGALORE-SOUTH taluk | |
| Sy. 63/1: filed extent, KGIS plot | 12,545 sq m, 1,24,555 sq m | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 63/1 | |
|---|---|---|
| Land extent, Sy 63/1 | 3 Acres, 4 Guntas | |
| Whole survey numbers on the KGIS map | 1,24,555 sq m (the project holds a share) | |
| Khata | E Khatha · 16 Jul 2023 | |
| Sale deed | Dated 3 Mar 2023 | |
| Sale deed in favour of | Annragh International LLP |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 63/1 | 1 | 21 acres 21 guntas | 3 acres 4 guntas | 30 acres 31 guntas | Differs: 27 acres 27 guntas apart | 0 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 15 Mar 2017 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 63/1 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Plots in them | 6,605 | |
| Booked | 3,553 of 6,605 (54%) | |
| Unsold | 3,052 | |
| Booked a month, pooled | 70 plots | |
| Months to sell, pooled | 34 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 1.5 km, Bandemata-Near Kengeri | |
| Government land in the filed surveys | Sy 63: 80% of the parent survey, 24.66 of 30.81 acres | Review |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| RERA completion date | 31 Dec 2024 | |
|---|---|---|
| Work began, as filed | 7 Feb 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 22 Jun 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹26.03 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.54 Cr |
| Escrow bank | IDFC FIRST BANK · Basavanagudi Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 1.5 km, Kengeri Bus Terminal | |
| Metro, under construction | about 11 km, Hulimavu |
| Kempegowda Airport | 50.5 | 40 |
| MG Road (CBD) | 18 | 14 |
| Manyata Tech Park | 28.5 | 21 |
| ITPL, Whitefield | 35 | 28 |
| Ecospace, Bellandur ORR | 24.5 | 20 |
| Electronic City Ph 1 | 29 | 21 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Vrishabhavathi Valley 180MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north-west, named Hindu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |