Overview
Habitat
Overview
Habitat
Overview
Habitat
Overview
Title & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹9.27 Cr |
|---|
Loan & collateral
| Escrow bank | HDFC · HSR Layout |
|---|
Data room
71 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Chandrika ParadiseCompleted (regulator flag) | M/s.Chandrika Constructions | Plot | – | Completed |
| Gmc First GatesActive · 41% built | M/s GMC LANDMARKS LLP | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Mar 2030 |
| Livvzo LuxepolisCompleted (regulator flag) | M/s. PRAMOD MANDOTH PRAVEEN MANDOTH | Plot | ~1,200–2,750 sqft (estimate: filed carpet plus 25%) | Completed |
All 3 other projects in Anekal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Habitat in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 22 Jun 2022 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Plots in them | 126 | |
| Booked | 100 of 126 (79%) | |
| Unsold | 26 | |
| Booked a month, pooled | 5 plots | |
| Months to sell, pooled | 5 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 17.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Anekal Kere |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
| RERA completion date | 31 Dec 2019 | Red flag |
|---|---|---|
| Work began, as filed | 5 Mar 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | HDFC · HSR Layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 11 km, Bommasandra | |
| Metro, under construction | about 20 km, Kalena Agrahara |
| Kempegowda Airport | 70 | 53.5 |
| MG Road (CBD) | 36.5 | 30 |
| Manyata Tech Park | 45.5 | 37 |
| ITPL, Whitefield | 38 | 30 |
| Ecospace, Bellandur ORR | 29.5 | 23 |
| Electronic City Ph 1 | 16.5 | 13.5 |