Overview
Hexa Skyline
Overview
Hexa Skyline
Overview
Hexa Skyline
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 22 May 2024 · No. LP No BBMP/Ad.Com/BMH/2462/23-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 8 Jul 2024 |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2 and 3BHK units · avg 76 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹32.00 Cr 35.3%Development · ₹58.63 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 22 May 2024 | |
| Escrow bank | Karnataka Bank Ltd. · MINERVA CIRCLE |
Data room
102 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Hexa Skyline in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Aug 2027 |
| Land conversion | Converted 29 Jun 2015 · DISTRICT COMMISSIONER BENGALURU | |
|---|---|---|
| Survey numbers | 3036 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 and 3BHK units | 144 | 816 |
| Aqua Vista | about 1 km | Locked | |
|---|---|---|---|
| Platinum Landmark | about 2 km | Locked | |
| Iris Courtyard | about 2 km | Locked | |
| Azur Tower D | about 2.5 km | Locked | |
| Lodha Azur | about 2.5 km | Locked | |
| Sattva Forest Ridge | about 3.5 km | Locked | |
| Azur Phase 2 | about 4 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5 km | Locked | |
| Pacific Legacy | about 5.5 km | Locked | |
| Mahindra Eden Phase-2 | about 5.5 km | Locked | |
| Srivara Vasudha | about 5.5 km | Locked |
| Hexa Skyline This project | This project is the point the others are measured from | 31 Aug 2027 | – | Not verified yet |
|---|---|---|---|---|
| Aqua Vista | about 1 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Platinum Landmark | about 2 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Iris Courtyard | about 2 km | 30 Jun 2026 | 30% (12 of 40) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, BDA LAYOUT | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Gottigere Lake |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.10 (159 covered spaces for 144 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Mar 2027 | |
|---|---|---|
| RERA completion date | 31 Aug 2027 | |
| Work began, as filed | 1 Sep 2024 |
| Building heights, fire NOC | 13 m filed, 3 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 15 sq m |
|---|
| Architect's certificate, registration | Site inspected 8 Jun 2024 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 20 Jun 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹90.63 Cr | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹90.63 Cr, same as the filing |
| Escrow bank | Karnataka Bank Ltd. · MINERVA CIRCLE | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Azur Tower D | about 2.5 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Lodha Azur | about 2.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Sattva Forest Ridge | about 3.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 39 (39 with an approximate location) | |
|---|---|---|
| Flats in them | 10,898 | |
| Booked | 7,918 of 10,898 (73%) | |
| Unsold | 2,980 | |
| Booked a month, pooled | 241 flats | |
| Months to sell, pooled | 12 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4.5 km, Konankunte Cross | |
| Metro, under construction | about 1.5 km, Kalena Agrahara |
| Kempegowda Airport | 47.5 | 40 |
| MG Road (CBD) | 14.5 | 13.5 |
| Manyata Tech Park | 23.5 | 21 |
| ITPL, Whitefield | 30.5 | 21.5 |
| Ecospace, Bellandur ORR | 18 | 12.5 |
| Electronic City Ph 1 | 15 | 9.5 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Hulimavu 10MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the east, named Power Transformers - PU on OpenStreetMap |