Overview
Inspira Trees Of Life
Overview
Inspira Trees Of Life
Overview
Inspira Trees Of Life
Overview

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| RERA extensions | Granted · Approved 11 Jul 2022 | |
|---|---|---|
| RERA completion date | 30 Jun 2028 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹20.00 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹74.72 Cr | |
| Cost incurred | ₹24.98 Cr (33.4% of the Form 4 Q2 2026-27 estimate) |
Loan & collateral
| Escrow bank | HDFC · BANGALORE - KASTURBA GANDHI MARG |
|---|
Data room
83 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 8 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 8 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Inspira Trees Of Life in the interactive atlas
| Filed survey numbers matched to the KGIS map | 8 of 8 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,16,206 sq m | |
| Land area filed with K-RERA | 55,493 sq m | |
| Village, hobli and taluk on the KGIS map | Sarjapura, Sarjapura-1 hobli, Anekal taluk | |
| Mutation entry | None open on 8 of 8 filed surveys |
Satellite map with the 8 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 8 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Whole survey numbers on the KGIS map | 1,16,206 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 55,493 sq m |
| Sy. No. 7/1 | 8 | 5 acres 23 guntas | 0 | ||||
| Sy. No. 8 | 1 | 1 acre 30 guntas | 0 | ||||
| Sy. No. 102/1 | 1 | 2 acres 20 guntas |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Rent, 3BHK, 3 km | ₹34,500 /mo · 10 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹29,250 /mo · 20 listings | |
| Rent per sq ft, 3 km | ₹31.3 /mo, as listed · 23 listings with a size |
| Projects within 4 km, counted | 67 (43 with an approximate location) | |
|---|---|---|
| Plots in them | 15,505 | |
| Booked | 8,809 of 15,505 (57%) | |
| Unsold | 6,696 | |
| Booked a month, pooled | 199 plots | |
| Months to sell, pooled | 31 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 8.8 km, Gunjur |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 160 m to the north-east, an unnamed pond |
As the promoter reported it

| Completion | 18% | |
|---|---|---|
| Completion, accountant | 33.4% of the estimated cost spent |
| RERA completion date | 30 Jun 2028 | Review |
|---|---|---|
| Work began, as filed | 2 Mar 2013 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|
| Escrow bank | HDFC · BANGALORE - KASTURBA GANDHI MARG | |
|---|---|---|
| Designated account, collected | ₹6.05 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.24 Cr in Q2 2026-27 (70% of that quarter's deposits) |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 0 |
| Sy. No. 107 | 1 | 1 acre 17 guntas | 0 |
| Sy. No. 106 | 3 | 4 acres 20 guntas | 0 |
| Sy. No. 12/1 | 3 | 2 acres 22 guntas | 0 |
| Sy. No. 5 | 5 | 0 |
| Sy. No. 6 | 3 | 5 acres 24 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 9.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 12.0 km, Bommasandra | |
| Metro, under construction | 13.3 km, Kodibeesanahalli |
| Kempegowda Airport | 53.2 | 55 | 38.2 |
| MG Road (CBD) | 31.7 | 37 | 23.8 |
| Manyata Tech Park | 35.8 | 43 | 27.2 |
| ITPL, Whitefield | 19.9 | 23 | 14.6 |
| Ecospace, Bellandur ORR | 19.2 | 27 | 13.7 |
| Electronic City Ph 1 | 23.8 | 26 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 760 m to the south-east, named Sarjapur Substation on OpenStreetMap |