Overview
Jr Greenwich Phase 4
Overview
Jr Greenwich Phase 4
Overview
Jr Greenwich Phase 4
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 8 Nov 2021 · No. BDA/TPM/PRL-13/2020-21 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹3.67 Cr 71%Development · ₹1.50 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 8 Nov 2021 | |
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar |
Data room
103 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 534 projects in Sarjapur Road → · JR Housing Developers Pvt Ltd's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jr Greenwich Phase 4 in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore Urban District · Survey 79/1A1
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹3.40 Cr · Sy 79/1343; 79/1, KODATHI village, Varthur hobli
Title deed filed with K-RERA, pp. 1, 10, 17 · See it in Documents
Transfer of the land
Sale deed
in favour of JR Housing Developers Pvt Ltd · Survey 79/1A1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Kodathi Panchayath · Survey 79/1A1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-13/2020-21
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/301221/004612
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title report dated | 19 Nov 2021 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 8 of the encumbrance certificate. Filed with K-RERA: EC until 2019, 8 pages, English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 79/1a1 | |
|---|---|---|
| Land extent, Sy 79/1a1 | 3 Acre, 7 Gunta | |
| Khata | A Khatha · Kodathi Panchayath · 18 Sep 2020 | |
| Sale deed | Dated 18 Sep 2020 | |
| Sale deed in favour of | JR Housing Developers Pvt Ltd | |
| Title deed | Consideration ₹3.40 Cr · Sy 79/1A1; 79/1, KODATHI village | |
| Title deed | Kodathi village, Bengaluru East taluk · 3 Acre 07 Guntas |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 7 Nov 2024 |
| Land conversion | Converted 20 Aug 2020 · Deputy Commissioner, Bangalore Urban District | |
|---|---|---|
| Survey numbers | 79/1a1 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Rent, 4BHK, 3 km | ₹96,000 /mo · 7 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹62,500 /mo · 42 listings | |
| Rent, 2BHK, 3 km | ₹41,000 /mo · 79 listings | |
| Rent, 1BHK, 3 km | ₹22,000 /mo · 19 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 81 listings with a size |
| Projects within 4 km, counted | 88 (37 with an approximate location) | |
|---|---|---|
| Plots in them | 31,651 | |
| Booked | 16,308 of 31,651 (52%) | |
| Unsold | 15,343 | |
| Booked a month, pooled | 474 plots | |
| Months to sell, pooled | 30 months |
Map of the ground within about 950 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Valley / drain buffer, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 180 m from the filed location | Clear |
| Nearest government-flagged flood location | 2.6 km, Doddakannelli |
| Nearest storm drain | 1.9 km to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 370 m to the east, Kodathi Lake |
| RERA completion date | 7 Nov 2024 | Red flag |
|---|---|---|
| Work began, as filed | 8 Nov 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹5.17 Cr |
|---|
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar |
|---|
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 5 | |
| Other phases under this promoter name | 12 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 8 months early |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 950 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 890 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.9 km to the north, secondary drain | |
|---|---|---|
| Ground level | 895 m above sea level, plus or minus 4 m | |
| Metro, operational | 6.8 km, Electronic City | |
| Metro, under construction | 5.5 km, Kadubeesanahalli |
| Kempegowda Airport | 47.7 | 50 | 34.2 |
| MG Road (CBD) | 19.0 | 28 | 15.6 |
| Manyata Tech Park | 26.5 | 36 | 20.0 |
| ITPL, Whitefield | 14.5 | 18 | 10.8 |
| Ecospace, Bellandur ORR | 9.3 | 15 | 5.5 |
| Electronic City Ph 1 | 11.7 | 18 | 7.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 530 m to the north-west |