Overview
Kns Laurel Phase-II
Overview
Kns Laurel Phase-II
Overview
Kns Laurel Phase-II
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 95 | 29 Nov 2012 |
Approvals
| Building plan (BMRDA) | Sanctioned 11 Jan 2023 · No. APA/LAO/115/2017-18 | |
|---|---|---|
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹95.1 L 9%Development · ₹9.59 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 14 Aug 2025 | |
| Building plan (BMRDA) | Sanctioned 11 Jan 2023 | |
| Escrow bank | ICICI Bank · Vijayanagara |
Data room
193 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 7 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 7 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 534 projects in Sarjapur Road → · Neelanchal Landholdings LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kns Laurel Phase-II in the interactive atlas
| 21 Jan 2014 |
| 16 Mar 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli |
| 22 Guntas |
| 96 | 29 Nov 2012Deputy Commissioner, Bengaluru Urban District | 29 Nov 2012 | 16 Mar 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 25 Guntas |
|---|
| 97 | 29 Nov 2012Deputy Commissioner, Bengaluru Urban District | 21 Jan 2014 | 24 Apr 1987A Khatha · Revenue Department, Anekal Taluk. | 18 Guntas |
|---|
| 103 | 1 Aug 2013Deputy Commissioner, Bengaluru Urban District | 21 Jan 2014 | 21 Mar 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 22 Guntas |
|---|
| 105 | 8 Jan 2013Deputy Commissioner, Bengaluru Urban District | 21 Jan 2014 | 29 Mar 2012A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 37 Guntas |
|---|
| Survey 107 | ||||
|---|---|---|---|---|
| 107/2 | 28 Jul 2011Special Deputy Commissioner, Bengaluru Urban District | 29 Nov 2013 | 28 Dec 2006A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 01 Acre 12 Guntas |
| 107/1 | 28 Jul 2011Special Deputy Commissioner, Bengaluru Urban District | 5 Dec 2013 | 28 Dec 2006A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 1 Acre 20 Guntas |
| 107/1 | 29 Nov 2012Deputy Commissioner, Bengaluru Urban District | 5 Jul 2013 | 2 Jun 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 01 Acre 20 Gunta |
| 107/1 | 29 Nov 2012Deputy Commissioner, Bengaluru Urban District | 18 Dec 2020 | 2 Jun 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 01 Acre |
| 107/1 | 29 Nov 2012Deputy Commissioner, Bengaluru Urban District | 14 Feb 2014 | 16 Mar 2007A Khatha · Revenue Inspector, Sarjapura-1 Hobli | 1 Acre |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹75.0 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Kuthaganahalli village, Sarjapura hobli, Anekal taluk · 22 guntas
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Title deed executed
37guntas
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.00 Cr
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan APA/LAO/115/2017-18
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/091123/006401
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 14 Aug 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 55 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 55 pages.
| Filed survey numbers matched to the KGIS map | 7 of 7 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,46,667 sq m | |
| Extent the filed land schedule names for these survey numbers | 38,040 sq m | |
| Plot area against the filed extent | 3.86 times | |
| Village, hobli and taluk on the KGIS map | Koothaganahalli, SARJAPURA1 hobli, ANEKAL taluk | |
| Sy. 95: filed extent, KGIS plot | 2,226 sq m, 2,212 sq m | |
| Sy. 96: filed extent, KGIS plot | 2,529 sq m, 2,349 sq m | |
| Sy. 97: filed extent, KGIS plot | 1,821 sq m, 1,921 sq m | |
| Sy. 103: filed extent, KGIS plot | 2,226 sq m, 2,021 sq m | |
| Sy. 105: filed extent, KGIS plot | 3,743 sq m, 3,699 sq m | |
| Mutation entry | None open on 7 of 7 filed surveys |
Satellite map with the 7 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 7 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 95, 96, 97, 103, 105, 107/2 and 1 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,46,667 sq m (the project holds a share) | |
| Khata | A Khatha · Revenue Inspector, Sarjapura-1 Hobli · 16 Mar 2007; A Khatha · Revenue Department, Anekal Taluk. · 24 Apr 1987; A Khatha · Revenue Inspector, Sarjapura-1 Hobli · 21 Mar 2007; and 3 more | |
| Sale deed | Dated 29 Nov 2012, 5 Jul 2013, 29 Nov 2013 and 4 more | |
| Title deed | Sy 95, Kuthaganahalli village, Sarjapura hobli · 22 Guntas; Sy 97, Kuthaganahalli village, Sarjapura hobli; and 3 more items | |
| Title deed | Kuthaganahalli village, Sarjapura hobli, Anekal taluk |
| Sy. No. 95 | 1 | 22 guntas | 22 guntas | 22 guntas | Yes | 0 | ||
| Sy. No. 96 | 1 | 25 guntas | 25 guntas | 23 guntas | Yes | 0 | ||
| Sy. No. 97 |
| Power NOC |
|---|
| Filed with the registration |
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Applied for · Applied 23 Aug 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 |
| Land conversion | 10 of 10 parcels converted | |
|---|---|---|
| Sy 95, 96, 97, 107/1, 107/1, 107/1 | Converted 29 Nov 2012 · Deputy Commissioner, Bengaluru Urban District | |
| Sy 103 | Converted 1 Aug 2013 · Deputy Commissioner, Bengaluru Urban District | |
| Sy 105 | Converted 8 Jan 2013 · Deputy Commissioner, Bengaluru Urban District | |
| Sy 107/2, 107/1 | Converted 28 Jul 2011 · Special Deputy Commissioner, Bengaluru Urban District | |
| Survey numbers | 95 · 96 · 97 · 103 · 105 · 107/2 · 107/1 · 107/1 · 107/1 · 107/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 26 (26 with an approximate location) | |
|---|---|---|
| Plots in them | 4,660 | |
| Booked | 2,139 of 4,660 (46%) | |
| Unsold | 2,521 | |
| Booked a month, pooled | 98 plots | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 92% Residential (main), 8% Water body, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 8 km, Varthur police station | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 31 Jul 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 | Red flag |
| Work began, as filed | 22 Sep 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 9 Sep 2023 · site inspected 7 Sep 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 9 Sep 2023 | |
| Chartered accountant's certificate, registration | Dated 15 Sep 2023 |
| Estimated cost, at registration | ₹10.54 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹8.87 Cr |
| Escrow bank | ICICI Bank · Vijayanagara |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 5 |
| 18 guntas |
| 18 guntas |
| 19 guntas |
| Yes |
| 0 |
| Sy. No. 103 | 1 | 22 guntas | 22 guntas | 20 guntas | The map differs by 2 guntas | 0 |
| Sy. No. 105 | 2 | 37 guntas | 37 guntas | 37 guntas | Yes | 0 |
| Sy. No. 107/2 | 6 | 5 acres 13 guntas | 0 |
| Sy. No. 107/1 | 10 | 8 acres 10 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 11.5 km, Channasandra | |
| Metro, under construction | about 13 km, Kodibeesanahalli |
| Kempegowda Airport | 51 | 35.5 |
| MG Road (CBD) | 29.5 | 24 |
| Manyata Tech Park | 33.5 | 26.5 |
| ITPL, Whitefield | 17.5 | 12.5 |
| Ecospace, Bellandur ORR | 20 | 14.5 |
| Electronic City Ph 1 | 30.5 | 15.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |