Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 27 Nov 2018 |
|---|
Approvals
| Fire department | Filed with the registration |
|---|
| RERA extensions |
|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹4.1 L 0.1%Development · ₹36.46 Cr
Loan & collateral
| Records searched to | 27 Nov 2018 | Review |
|---|---|---|
| Escrow bank | VIJAYA BANK · VIJAYASAMRUDDHI |
Data room
47 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | 1 | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Ag Varaha ValleyApplied for completion 23/01/2026 | ABHISHEK . A | Plot | ~1,230–1,500 sqft (estimate: filed carpet plus 25%) | Aug 2025 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind OrchidsApplied for completion 16/02/2024 | Arvind Builders | Plot | ~1,200–1,680 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Ashwasurya LegacyRegistered · no quarterly update yet | M/s. Suryakalpa Ventures | Plot | ~1,200–2,220 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
8 of 65 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Krsna Laburnum in the interactive atlas
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page, English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 2,793 sq m |
|---|
| Applied for · Applied 10 Apr 2019 |
| RERA completion date | 10 Aug 2018 |
|---|
| Registration status | Revoked | Red flag |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest high-tension line | A 220 kV line passes 10 m from the filed location: close enough that its corridor may cross the site | Review |
|---|---|---|
| Nearest government-flagged flood location | 16.8 km, Shambhavinagar |
| Nearest storm drain | 240 m to the south-east, Kumudavathi, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 780 m to the north-east, an unnamed tank |
| RERA completion date | 10 Aug 2018 | |
|---|---|---|
| Work began, as filed | 10 Feb 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹36.50 Cr |
|---|
| Escrow bank | VIJAYA BANK · VIJAYASAMRUDDHI | |
|---|---|---|
| Registration at K-RERA | Revoked |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.1 m
Taluk average; not a reading at the site.
| Groundwater | Nelamangala taluk average, July 2023: 27.9 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 0 of 3 CGWB wells in Nelamangala taluk read in this class | |
| Through the year | January 2024: 5.2 m (3 wells), Pre-monsoon 2024: 5.4 m (3 wells), August 2024: 5.4 m (3 wells), depth below ground of CGWB's monitoring wells in Nelamangala taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 18.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 240 m to the south-east, Kumudavathi, primary drain | |
|---|---|---|
| Ground level | 849 m above sea level, plus or minus 4 m | |
| Metro, operational | 15.7 km, Madavara | |
| Metro, under construction | 28.4 km, Jakkur Cross |
| Kempegowda Airport | 58.1 | 62 | 42.3 |
| MG Road (CBD) | 36.9 | 41 | 31.9 |
| Manyata Tech Park | 35.6 | 41 | 31.6 |
| ITPL, Whitefield | 51.5 | 58 | 45.4 |
| Ecospace, Bellandur ORR | 50.5 | 59 | 42.0 |
| Electronic City Ph 1 | 62.4 | 54 | 46.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |