Overview
Lakecity Phase 1
Overview
Lakecity Phase 1
Overview
Lakecity Phase 1
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 33 | ||||
Approvals
| Building plan (BDA) | Sanctioned 12 Mar 2025 · No. PRL-11/3300/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Land · ₹37.02 Cr 40.7%Development · ₹54.04 Cr
Loan & collateral
| Records searched to | 15 May 2025 | |
|---|---|---|
| Building plan (BDA) | Sanctioned 12 Mar 2025 | |
| Escrow bank | STATE BANK OF INDIA · HSR Layout |
Data room
234 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Valuation, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 16 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 16 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 4 sections
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lakecity Phase 1 in the interactive atlas
| 33/1 |
|---|
| 5 Mar 2022DC |
| 14 Dec 2021 |
| 14 Dec 2021E Khatha · Village accountant |
| 11.5G |
| 33/2 | 7 Feb 2022DC | 3 Apr 2021 | 7 Feb 2022A Khatha · Village Accountant | 13.5G |
|---|
| 33/3 | 7 Feb 2022DC | 29 Mar 2021 | 7 Feb 2022A Khatha · VillageAccountant | 3G |
|---|
| 33/4 | 7 Feb 2022DC | 29 Mar 2021 | 7 Feb 2022A Khatha · Village Accountant | 2.5G |
|---|
| 33/5 | 7 Feb 2022DC | 29 Mar 2021 | 7 Feb 2022E Khatha · Village Accountant | 2.5G |
|---|
| 33/6 | 7 Feb 2022DC | 29 Mar 2021 | 7 Feb 2022A Khatha · Village Accountant | 2.5G |
|---|
| 33/7 | 7 Feb 2022DC | 7 Feb 2022 | 7 Feb 2022A Khatha · Village Accountant | 2.75G |
|---|
| Survey 35 | ||||
|---|---|---|---|---|
| 35/2 | 22 Jun 2022DC | 13 Jul 2021 | 22 Jun 2022A Khatha · Village Accountant | 1Acre 29.5G |
| 35/3 | 18 Mar 2022DC | 9 Jun 2022 | 9 Jun 2022E Khatha · Village Accountant | 16G |
| 35/4 | 5 Mar 2022DC | 8 Apr 2021 | 5 Mar 2022E Khatha · Village Accountant | 14G |
| 35/6 | 5 Mar 2022DC | 3 Apr 2021 | 5 Mar 2022E Khatha · Village Accountant | 1acre |
| 35/7 | 5 Mar 2022DC | 24 Jun 2021 | 9 Aug 2021E Khatha · Village Accountant | 16G |
| Survey 37 | ||||
|---|---|---|---|---|
| 37/1 | 21 Aug 2012DC | 17 Jul 2021 | 30 May 2023E Khatha · Village accountant | 1A 03G |
| 37/4 | 7 Feb 2022DC | 8 Apr 2021 | 8 Apr 2021E Khatha · Village Accountant | 1G |
| 49/1B | 19 Aug 2013DC | 4 Mar 2021 | 4 Mar 2021E Khatha · Village Accountant | 1A 19G |
|---|
| 50/2 | 13 Oct 2021DC | 22 Jan 2024 | 13 Oct 2021E Khatha · Village Accountant | 1A 6G |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹1.84 Cr · Sy 37/1, Chikkanagamangala village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9, 19 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹95.0 L · Sy 35/1; 35/6, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹37.5 L · Sy 37; 37/4, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 5, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹38.0 L · Sy 35/1; 35/7, Chikkanagamangala village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹72.0 L · Sy 38; 38/1, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 7, 11 · See it in Documents
Approval or registration
Building plan sanctioned
BDA · plan PRL-11/3300/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/160525/007754
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 15 May 2025 |
|---|
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: EC Sy No 33 2, 2 pages.
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR survey sketch, 1 page.
| Filed survey numbers matched to the KGIS map | 16 of 16 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 66,930 sq m | |
| Extent the filed land schedule names for these survey numbers | 34,676 sq m | |
| Plot area against the filed extent | 1.93 times | |
| Village, hobli and taluk on the KGIS map | Chikkanagamangala, SARJAPURA2 hobli, ANEKAL taluk | |
| Sy. 49/1B: filed extent, KGIS plot | 5,969 sq m, 18,186 sq m | |
| Sy. 50/2: filed extent, KGIS plot | 4,654 sq m, 14,370 sq m | |
| Mutation entry | None open on 16 of 16 filed surveys |
Satellite map with the 16 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 16 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 33/1, 33/2, 33/3, 33/4, 33/5, 33/6 and 10 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 66,930 sq m (the project holds a share) | |
| Khata | E Khatha · Village accountant · 14 Dec 2021; A Khatha · Village Accountant · 7 Feb 2022; A Khatha · VillageAccountant · 7 Feb 2022; and 9 more | |
| Sale deed | Dated 4 Mar 2021, 29 Mar 2021, 3 Apr 2021 and 8 more | |
| Title deed | Consideration ₹22.3 L · Sy 50/2, Chikkanagamangala village, Sarjapura hobli, Anekal taluk | |
| Title deed | Consideration ₹69.8 L · Sy 33; 33/3; Sy 33; 33/4; and 2 more items | |
| Title deed | Consideration ₹69.8 L · Sy 33; 33/3; Sy 33; 33/4; and 2 more items | |
| Title deed | Sy 37/3, Sarjapura hobli, Anekal taluk; Sy 37/4, Sarjapura hobli, Anekal taluk | |
| Title deeds | And 7 more read from the filing |
| Sy. No. 33/1 | 1 | 11 guntas | 0 | |||||
| Sy. No. 33/2 | 3 | 13 guntas | 0 | |||||
| Sy. No. 33/3 | 1 |
| Pollution board (CFE) |
|---|
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | 16 of 16 parcels converted | |
|---|---|---|
| Sy 33/1, 35/4, 35/6, 35/7 | Converted 5 Mar 2022 · DC | |
| Sy 33/2, 33/3, 33/4, 33/5, 33/6, 33/… | Converted 7 Feb 2022 · DC | |
| Sy 35/2 | Converted 22 Jun 2022 · DC | |
| Sy 35/3 | Converted 18 Mar 2022 · DC | |
| Sy 37/1 | Converted 21 Aug 2012 · DC | |
| Sy 49/1B | Converted 19 Aug 2013 · DC | |
| Other parcels | 1 more groups on the filing | |
| Survey numbers | 33/1 · 33/2 · 33/3 · 33/4 · 33/5 · 33/6 · 33/7 · 35/2 · 35/3 · 35/4 · 35/6 · 35/7 · 37/1 · 37/4 · 49/1B · 50/2 |
₹99 for this report opens Contract & costs, Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Valuation, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 4.0 km, G K LAYOUT | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 270 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 80 m to the west, an unnamed tank |
| Possession, agreement | 31 Dec 2031 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 May 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance | Filed with the registration | |
|---|---|---|
| Engineer's certificate, registration | Dated 24 Apr 2025 |
| Estimated cost, at registration | ₹91.06 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹18.11 Cr |
| Escrow bank | STATE BANK OF INDIA · HSR Layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 0 |
| Sy. No. 33/4 | 1 | 3 guntas | 0 |
| Sy. No. 33/5 | 1 | 3 guntas | 0 |
| Sy. No. 33/6 | 1 | 3 guntas | 0 |
| Sy. No. 33/7 | 1 | 3 guntas | 0 |
| Sy. No. 35/2 | 1 | 1 acre 29 guntas | 0 |
| Sy. No. 35/3 | 1 | 16 guntas | 0 |
| Sy. No. 35/4 | 1 | 14 guntas | 0 |
| Sy. No. 35/6 | 1 | 1 acre | 0 |
| Sy. No. 35/7 | 1 | 16 guntas | 0 |
| Sy. No. 37/1 | 7 | 1 acre 3 guntas | 0 |
| Sy. No. 37/4 | 1 | 4 guntas | 0 |
| Sy. No. 49/1B | 1 | 1 acre 19 guntas | 1 acre 19 guntas | 4 acres 20 guntas | The map differs by 3 acres 1 gunta | 0 |
| Sy. No. 50/2 | 1 | 1 acre 6 guntas | 1 acre 6 guntas | 3 acres 22 guntas | The map differs by 2 acres 16 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 1 km of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 1.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 270 m to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 900 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.3 km, Huskur Road | |
| Metro, under construction | 8.0 km, Ibbalur |
| Kempegowda Airport | 53.0 | 60 | 38.3 |
| MG Road (CBD) | 18.8 | 28 | 16.7 |
| Manyata Tech Park | 29.4 | 38 | 22.5 |
| ITPL, Whitefield | 21.3 | 29 | 15.4 |
| Ecospace, Bellandur ORR | 13.4 | 20 | 8.0 |
| Electronic City Ph 1 | 7.1 | 13 | 2.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 860 m to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.8 km to the south-west, named Tata P.P. Solar on OpenStreetMap |