Photo: Leafy SereneTitle & ownership
Approvals
| Building plan (Anekal Planning Authority) | Sanctioned 26 Mar 2026 · No. APA/CC/1108/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3 BHK Flats · avg 85 m² 90.9%2 BHK Flats
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 26 Mar 2026 | |
| Escrow bank | DCB Bank · Yelahanka |
Data room
83 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 534 projects in Sarjapur Road → · Leafy Realty LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Leafy Serene in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 16 Jul 2008 · Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 14 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2 BHK Flats | 4 | 2,799 |
| 3 BHK Flats | 40 | 36,694 |
| Sold, Q2 2026-27 | 4 / 44 | |
|---|---|---|
| Unsold, Q2 2026-27 | 40 | |
| Months to sell, derived from filed bookings | Too few bookings to project (3 flats booked in 3 months) |
| Coevolve Florenza | about 0.5 km | Locked | |
|---|---|---|---|
| Leafy Avenue | about 1.5 km | Locked | |
| Vasudharini Nest | about 2 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 3 km | Locked | |
| Leafy Delight | about 3 km | Locked | |
| Nambiar District 25 Phase 2 | about 4 km | Locked | |
| Royal Nest | about 4 km | Locked | |
| Suyug's Saffron | about 4 km | Locked | |
| Jeevan's Allure | about 4.5 km | Locked | |
| Engrace Vista | about 4.5 km | Locked | |
| Sowparnika Olivia Nest | about 4.5 km | Locked | |
| Engrace 3 | about 4.5 km | Locked |
| Leafy Serene This project | This project is the point the others are measured from | 31 Dec 2028 | 9% (4 of 44) | Not verified yet |
|---|---|---|---|---|
| Coevolve Florenza | about 0.5 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
| Leafy Avenue | about 1.5 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
| Vasudharini Nest | about 2 km | 31 Mar 2028 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 6 km, Varthur police station | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.09 (48 covered spaces for 44 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 30 Jun 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2028 | |
| Club house | Not started | |
| Completion | 5% | |
| Completion, accountant | 6.1% of the estimated cost spent |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jun 2026 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 50 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 11 Apr 2026 | |
| Engineer's certificate, registration | Dated 11 Apr 2026 | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
| Architect's quarterly progress certificate | 5% complete per the architect, as of 9 Oct 2026 | |
| Architect's quarterly progress certificate dated | 9 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 1 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.71 Cr 18.7%Development · ₹20.45 Cr 81.3%
| Estimated cost, at registration | ₹25.16 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹13.71 Cr | |
| Cost incurred | ₹1.53 Cr (6.1% of the estimate) |
Sold (4) 9.1%Unsold (40) 90.9%
| Sold, Q1 2026-27 | 1 / 44 · 43 available | |
|---|---|---|
| Sold, Q2 2026-27 | 4 / 44 · 40 available | |
| Unsold, Q2 2026-27 | 40 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | DCB Bank · Yelahanka | |
|---|---|---|
| Designated account, collected | ₹53.6 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹55.0 L in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹1,25,81,027 | |
| Net amount withdrawable, Form 4 | ₹70,79,023 | |
| Escrow account to date, Q2 2026-27 | ₹55.0 L withdrawn | |
| Withdrawn from the escrow account to date | ₹55,02,004 | |
| Sale proceeds realised, Q1 2026-27 | ₹2,00,000 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31% (26 of 84) |
| Locked |
| Bilva Phase-II By Bhavisha Homes | about 3 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Leafy Delight | about 3 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
|---|
| Nambiar District 25 Phase 2 | about 4 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
|---|
| Projects within 4 km, counted | 57 (57 with an approximate location) | |
|---|---|---|
| Flats in them | 18,046 | |
| Booked | 10,068 of 18,046 (56%) | |
| Unsold | 7,978 | |
| Booked a month, pooled | 252 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Local Water Body) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 10.5 km, Channasandra | |
| Metro, under construction | about 11 km, Kodibeesanahalli |
| Kempegowda Airport | 49.5 | 34.5 |
| MG Road (CBD) | 28.5 | 22 |
| Manyata Tech Park | 32.5 | 24.5 |
| ITPL, Whitefield | 16.5 | 11.5 |
| Ecospace, Bellandur ORR | 19 | 12 |
| Electronic City Ph 1 | 28 | 13.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |