Building plan (BBMP)Sanctioned 8 Feb 2022No. BBMP/Addl.Dir/JDNORTH/0038/21-22
RERA extensionsGranted!ReviewReview
Land conversionNot convertedAs declared on the filing
Permits
Approval letters
Building plan (BBMP)
Sanctioned 8 Feb 2022 · No. BBMP/Addl.Dir/JDNORTH/0038/21-22
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Residential · avg 149 m² 100%
Unit types
Location & risks
What is the location like?
Clear1 clear
Groundwater, taluk average22.7 m below groundBengaluru North taluk, July 2023
Water supply, as filedBorewell, BWSSBDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion100%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Sold8 / 14As of Q2 2026-27
Sold in Q2 2026-270✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 8 Feb 2022
Escrow bank
Indian Bank · Halasuru
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
161 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Living Walls Olde Town in the interactive atlas
Survey 92-1-45/1
Approval or registration
Khata issued
A Khatha · BBMP, Malleshwaram · Survey 92-1-45/1
K-RERA filing, land schedule
2022
Project
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0038/21-22
K-RERA filing, approvals
Project
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/070622/004966
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Charges
Developer's project loan
None declared
Mortgage on the project land
None declared
Boundaries
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Title report; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Landowner share; Developer share; Sale deed signed by.
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/230/2021 · issued 23 Dec 2021 · building height 29.95 m
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
NOC ID JAKK/SOUTH/B/110518/347426
Pollution board (CFE)
Filed with the registration
Water and sewerage NOC (BWSSB)
issued 14 Jun 2022
RERA
K-RERA
RERA extensions
Granted · Approved 26 Mar 2025
RERA completion date
8 Mar 2027
Registration certificates
PRM/KA/RERA/1251/446/PR/070622/004966
EX/PRM/KA/RERA/1251/446/PR/250326/004966
Land use
Conversion order
Land conversion
Declared not converted
Survey numbers
92-1-45/1
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; Central Bengaluru, past year; Bengaluru, past year; Central Bengaluru since 2022; This project vs Central Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Bengaluru median yield.
2.4 kmCubbon Park
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Land · ₹17.76 Cr 52.4%Development · ₹16.14 Cr 47.6%
Form 4
Estimated cost, at registration
₹33.90 Cr
Estimated cost, engineer's certificate
₹33.90 Cr, same as the filing
Sales
Sold vs unsold, Q2 2026-27
Sold (8) 57.1%Unsold (6) 42.9%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
8 / 14 · 6 available
Sold, Q4 2025-26
8 / 14 · 6 available
Sold, Q1 2026-27
8 / 14 · 6 available
Sold, Q2 2026-27
8 / 14 · 6 available
Unsold, Q2 2026-27
6
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Indian Bank · Halasuru
Designated account, collected
₹0 in Q2 2026-27
Designated account, withdrawn
₹0 in Q2 2026-27
Track record
DOSL builder track
K-RERA registrations under this promoter
6
Marked completed
2
Past promised date, not completed
2
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q1 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru North taluk average, July 2023: 22.7 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class
Through the year
January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB
Nearest city water main
120 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.