Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
Locked
Recent price, super built-upNot verified yet
Recent price, carpet₹ ••,•••
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Location & risks
What is the location like?
Clear2 clear
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion8%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Sold106 / 119✓ClearClear
Sold in Q2 2026-273✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 9 Apr 2025
Escrow bank
Axis Bank · Nitesh Times Square Building No.08, 3rd Floor, M.G. Road, Bangalore
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
152 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Valuation, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Working at 12:00 a.m. with loud construction noise is completely unacceptable. The complete disregard for residents trying to sleep is shocking. If you can’t follow basic rules and respect the neighborhood, you shouldn’t be carrying out…
Ttodd gobbler5 Aug 2026★★★★★
Construction noise was still going on at 12:00 a.m. (midnight). Loud drilling and other work at that hour is completely unacceptable and shows no consideration for the people living nearby who are trying to sleep. Construction should be…
AAmith K6 Jun 2026★★★★★
Mahindra Zen construction is coming up well as per plan. The superstructure of A Tower (having 3, 3.5 & 4 BHK) has reached 21st floor. It's on Manipal County Road which is just 400 mtr from the Hosur Main Road & 700 mtr from Metro station.…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra NewHaven in the interactive atlas
Survey 62
Transfer of the land
Sale deed
in favour of Mahindra Lifespace Developers Limited · Survey 62
K-RERA filing, land schedule
Survey 62
Approval or registration
Khata issued
A Khatha · BBMP · Survey 62
K-RERA filing, land schedule
2025
Project
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0043/24-25
K-RERA filing, approvals
Project
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/160425/007668
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Charges
Developer's project loan
None declared
Survey sketch
Survey sketch filed with K-RERA
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Title report; Schedule in the EC vs KGIS neighbours; Encumbrance certificate, Form 15; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Environmental clearance
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
28 Dec 2029
Registration certificates
PRM/KA/RERA/1251/310/PR/160425/007668
Land use
Conversion order
Land conversion
Converted 29 May 2024 · Deputy Commissioner, Bangalore
Survey numbers
62
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Form 4 certified totals
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Agreements in the Form 4 sold list
Not verified yet
Unit sizes
Carpet vs rest, by type
Not verified yet
Unit mix filed
Unit types
•• of ••
₹ ••,•••
•• %
•• ••• ••••
•••••
Floor plans, brochure
Not verified yet
Unsold stock
K-RERA inventory
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Registered deeds
Transactions in this project
Not verified yet
The area
Price trend
South Bengaluru, past yearNot verified yet
Bengaluru, past yearNot verified yet
South Bengaluru since 2022Not verified yet
This project vs South BengaluruNot verified yet
Price per sq ft, super built-up
Not verified yet
By quarter
Not verified yet
Registered sales around
Registered sale price per sq ft, by year
Not verified yet
Transactions around this project
Not verified yet
Comparable projects
Carpet price, projects within 4 km
•• %
•• %
•• %
•• %
•• %
Filed prices nearby
Nearest 12 with filed prices
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Nearest projects
This project vs the nearest with filed prices
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Rent & yield
Median rent, 3 km
•• %
•• %
•• %
•• %
•• %
Gross yield
Not verified yet
Rents and yields
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unsold stock nearby
Months to sell unsold stock
•• %
•• %
•• %
•• %
•• %
K-RERA inventory
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
1.0 kmSingasnadra
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Land · ₹62.50 Cr 32.4%Development · ₹130.64 Cr 67.6%
Form 4
Estimated cost, at registration
₹193.14 Cr
Estimated cost, architect's and engineer's certificates
₹118.31 Cr
Cost incurred
₹65.75 Cr (34% of the estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (106) 89.1%Unsold (13) 10.9%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
103 / 119 · 16 available
Sold, Q4 2025-26
103 / 119 · 16 available
Sold, Q1 2026-27
103 / 119 · 16 available
Sold, Q2 2026-27
106 / 119 · 13 available
Unsold, Q2 2026-27
13
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
3
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Axis Bank · Nitesh Times Square Building No.08, 3rd Floor, M.G. Road, Bangalore
Designated account, collected
₹19.85 Cr in Q2 2026-27
Designated account, withdrawn
₹7.15 Cr in Q2 2026-27 (36% of that quarter's deposits)
Amount withdrawable, Form 4
₹15,62,50,196
Net amount withdrawable, Form 4
₹1,11,20,317
Withdrawn from the escrow account to date
₹14,51,29,879
Track record
DOSL builder track
K-RERA registrations under this promoter
7
Marked completed
4
Past promised date, not completed
0
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q1 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
BWSSB
Nearest city water main
220 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.