Overview
Mantri Elegance
Overview
Mantri Elegance
Overview
Mantri Elegance
Overview
Photo: BACK2BASICS @ Mantri Elegance| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Cornerstone Akhinta ResidencesActive · 100% built | AKHINTA ENTERPRISES PRIVATE LIMITED | Apartment | 1,490–1,816 sqft carpet (as filed) | Dec 2026 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Green City EutopiaLapsed · completion date passed | GREEN CITY CONSTRUCITONS PRIVATE LIMITED | Apartment | – | Sep 2021 |
| Opulent SpireCompleted · OC 29-04-2022 | B and B INFRASTRUCTURE LTD | Mixed development | – | Completed |
| R EmeraldLapsed · completion date passed | R R S BUILDERS AND DEVELOPERS | Apartment | – | Sep 2018 |
| SolarisLapsed · completion date passed | DISHA LOHARUKA INFRA PROJECTS | Apartment | 924 sqft carpet (as filed) | Sep 2024 |
All 5 other projects in BTM Layout, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mantri Elegance in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Pacific Legacy, price locked; Lodha Azur, price locked.
| Pacific Legacy | 1.5 km | Locked | |
|---|---|---|---|
| Lodha Azur | 3.9 km | Locked | |
| Iris Courtyard | about 4.5 km | Locked | |
| Dhiraan Lotus | about 4.5 km | Locked | |
| Adarsh Premia | 4.4 km | Locked | |
| Azur Tower D | 4.5 km | Locked | |
| Aydin Infra Signature 3 | 4.7 km | Locked | |
| Azur Phase 2 | about 5 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 5.5 km | Locked | |
| Vista Svara | about 5.5 km | Locked | |
| Song Of Wind | about 5.5 km | Locked | |
| Aqua Vista | about 5.5 km | Locked |
| Mantri Elegance This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Pacific Legacy | 1.5 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Lodha Azur | 3.9 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
| Iris Courtyard | about 4.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Dhiraan Lotus | about 4.5 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Adarsh Premia | 4.4 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Azur Tower D | 4.5 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
| Rent, 3BHK, 3 km | ₹48,750 /mo · 88 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹27,400 /mo · 214 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 190 listings | |
| Rent per sq ft, 3 km | ₹30.1 /mo, as listed · 160 listings with a size |
| Projects within 4 km, counted | 14 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,590 | |
| Booked | 846 of 1,590 (53%) | |
| Unsold | 744 | |
| Booked a month, pooled | 24 flats | |
| Months to sell, pooled | 30 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 460 m from the site | Clear |
| Nearest government-flagged flood location | 460 m, Hosur road Jayadeva flyover to Udupi Garden Signal |
| Nearest storm drain | 270 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 1.1 km to the north, an unnamed water body |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 11 | Review |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Nearest city water main | 200 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 270 m to the south-east, tertiary drain | |
|---|---|---|
| Ground level | 903 m above sea level, plus or minus 4 m | |
| Metro, operational | 810 m, BTM Layout | |
| Metro, under construction | 360 m, J.P. Nagar 4th Phase |
| Kempegowda Airport | 43.0 | 47 | 33.8 |
| MG Road (CBD) | 8.3 | 13 | 7.0 |
| Manyata Tech Park | 19.3 | 25 | 14.8 |
| ITPL, Whitefield | 23.8 | 27 | 16.7 |
| Ecospace, Bellandur ORR | 10.9 | 16 | 8.6 |
| Electronic City Ph 1 | 14.3 | 18 | 11.6 |
| Landfill or waste transfer station | 930 m to the north-west | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 830 m to the north, named Jayadeva on OpenStreetMap |