Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (HMDA) | Sanctioned 18 Mar 2024 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
Disputes & cases
Builder: MEGHA DEVELOPERS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: Telangana RERA project page and the documents filed there, as read by us.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
Filed with K-RERA: Details of encumbrances.
| Survey numbers | ||
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 936 sq m | |
| Airport height NOC | Not verified yet | |
|---|---|---|
| Pollution board (CFE) | Not verified yet | |
|---|---|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 18 Mar 2030 |
101 3BHK 5%102 3BHK 5%103 3BHK 5%104 3BHK 5%16 other types 80%
| 101 3BHK | 1 | Not filed |
| 102 3BHK | 1 | Not filed |
| 103 3BHK | 1 | Not filed |
| 104 3BHK | 1 | Not filed |
| 201 3BHK | 1 | Not filed |
| 202 3BHK | 1 | Not filed |
| 203 3BHK | 1 | Not filed |
| 204 3BHK | 1 | Not filed |
| 301 3BHK | 1 | Not filed |
| 302 3BHK | 1 | Not filed |
| 303 3BHK | 1 | Not filed |
| 304 3BHK | 1 | Not filed |
| 401 3BHK | 1 | Not filed |
| 402 3BHK | 1 | Not filed |
| 403 3BHK | 1 |
Map of mapped waterways within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Nearest mapped waterway or drain | about 0.5 km, stream | |
|---|---|---|
| Nearest mapped inland water body | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Water Supply : · Sewerage (Chamber, Lines, Septic Tank , STP) : · Green Strip/TOT LOT/Park : · Water Conservation, Rain water Harvesting : · Electrical Meter Room, Sub-Station, Receiving Station : | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not started | |
| Club house | Not verified yet | |
| Completion | Not verified yet | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 18 Mar 2030 | |
Not booked 100%
| Registered units | 20 | |
|---|---|---|
| Booked | 0 | |
| Not booked | 20 |
| 404 3BHK | 1 | Not filed |
| 501 3BHK | 1 | Not filed |
| 502 3BHK | 1 | Not filed |
| 503 3BHK | 1 | Not filed |
| 504 3BHK | 1 | Not filed |
Map of mapped waterways and water bodies within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
Well within 3 km of filed pin; not a site reading.
| Groundwater | monitoring well, 2026-01-10: 10.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 10.6 m, at the monitoring well | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest mapped waterway or drain | about 0.5 km, stream | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Rajiv Gandhi International Airport | 23 |
| Abids | 10.5 |
| Secunderabad Junction railway station | 9 |
| HITEC City | 21 |
| Financial District, Hyderabad | 24 |
| Landfill or waste transfer station | about 1.5 km, named Temporaray GHMC Burning Dump yard on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None mapped within 3 km | |
| Crematorium | None mapped within 3 km | |
| Prison | None mapped within 3 km | |
| Electrical substation | about 1 km |