Building plan (BDA)Sanctioned 15 May 2026No. BDA/NM/AS/AA-5/TS-2/E/09/2026-27
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 17 of 17 parcelsDates and authorities below
Permits
Approval letters
Building plan (BDA)
Sanctioned 15 May 2026 · No. BDA/NM/AS/AA-5/TS-2/E/09/2026-27
Power NOC
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review1 to review
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedLocal authority (Panchayat)Declared by the promoter
Metro, operationalabout 8 kmHuskur Road
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion0%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Cost left₹1476.33 CrAs of Q2 2026-27
Sold327 / 1,202As of Q2 2026-27
Sold in Q2 2026-27230✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Records searched to
20 May 2026
Building plan (BDA)
Sanctioned 15 May 2026
Escrow bank
RATNAKAR BANK · Residency Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
209 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 17 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 17 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nambiar District 25 Phase 3 in the interactive atlas
4 Aug 2023DC,Bangalore
9 Mar 2022in favour of Nambiar EnsembleResidential Projects LLP
21 Jan 2025E Khatha · Panchayati Raj
01 acres,34 gunta
162/2
4 Aug 2023DC, Bangalore
9 Mar 2022in favour of Nambiar EnsembleResidential Projects LLP
21 Jan 2025E Khatha · Panchayati Raj
0 acre, 03 gunta
Survey 163
163/1
29 Sep 2022DC, Bangalore
9 Mar 2022in favour of Nambiar EnsembleResidential Projects LLP
21 Jan 2025E Khatha · Panchayati Raj
0 Acre, 27 Gunta
163/2, 163/3, 163/4
21 Apr 2022DC, Bangalore
9 Mar 2022in favour of Nambiar EnsembleResidential Projects LLP
Extent the filed land schedule names for these survey numbers
81,332 sq m
Plot area against the filed extent
1.56 times
Land area filed with K-RERA
46,569 sq m
Village, hobli and taluk on the KGIS map
Dommasandra, SARJAPURA3 hobli, ANEKAL taluk
Sy. 253/2: filed extent, KGIS plot
9,510 sq m, 35,168 sq m
Sy. 161/2: filed extent, KGIS plot
6,273 sq m, 7,588 sq m
Sy. 167/3: filed extent, KGIS plot
2,833 sq m, 18,954 sq m
Mutation entry
None open on 17 of 17 filed surveys
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 17 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 17 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
162/1, 162/2, 163/1, 163/2, 163/3, 163/4 and 11 more
Whole survey numbers on the KGIS map
1,26,920 sq m (the project holds a share)
Land area of this registration
46,569 sq m
Khata
E Khatha · Panchayati Raj · 21 Jan 2025
Sale deed
Dated 9 Mar 2022
Sale deed in favour of
Nambiar EnsembleResidential Projects LLP
The RTC of each filed survey
Sy. No. 162/1
████████
1
1 acre 34 guntas
0
Sy. No. 162/2
████████
1
3 guntas
0
Sy. No. 163/1
████████
1
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Share of sales revenue; Joint development agreement.
Fire NOC
KSFES/NOC/178/2026 · issued 12 May 2026
✓Clear
Environmental clearance
SEIAA 99 CON 2023 · EC identification no. EC23B038KA110863 · issued 30 Nov 2023
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
93% Agriculture, 7% Valley / drain buffer, over the filed survey numbers
!Review
Nearest government-flagged flood location
about 5.5 km, Gunjur
Government land in the filed surveys
Not found
Flooding
Site vs nearest drain
Nearest storm drain
None within 3 km
Nearest lake, tank or pond
about 0.5 km, an unnamed tank
Drains, lakes and flood locations around the filed pin
Amenities
Specification and Form 5
Amenities declared
Electricity · CCTV Surveillance · Power Backup · Water and Sanitation
Electricity, built
0%
Outdoor Sports facility, built
0%
Parks, built
0%
Water and Sanitation, built
0%
Covered parking per unit
1.43 (1,723 covered spaces for 1,202 units)
Power backup
Declared by the promoter
Around it
Water
Groundwater, Anekal taluk average
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant, Nearest city water main, Ground level.
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
Not started · planned by 11 Oct 2029
Electrical and plumbing finishing
Not started · planned by 22 Jan 2031
Completion
0%
Completion, accountant
21.7% of the estimated cost spent
Dates
Dates
Filed dates
Schedule end
21 Apr 2031
RERA completion date
29 Feb 2032
Work began, as filed
15 Jul 2026
Specified structure
What the promoter specified · not an inspection
Building heights, fire NOC
filed: Tower -13 114.5 m, Tower -14 114.5 m, Tower-15 119.55 m, Tower-16 119.55 m, Tower-17 119.55 m, Tower-18 119.55 m, Tower-19 119.55 m, Tower-20 119.55 m
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹409.48 Cr 21.7%Development · ₹1476.27 Cr 78.3%
Form 4
Estimated cost, at registration
₹1885.75 Cr
Cost incurred
₹409.42 Cr (21.7% of the estimate)
Cost left
₹1476.33 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (327) 27.2%Unsold (875) 72.8%
Sold per quarter
K-RERA inventory
Sold, Q1 2026-27
97 / 1,202 · 1,105 available
Sold, Q2 2026-27
327 / 1,202 · 875 available
Unsold, Q2 2026-27
875
Sold in Q2 2026-27
230
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
RATNAKAR BANK · Residency Road
Designated account, collected
₹76.03 Cr in Q2 2026-27
Designated account, withdrawn
₹8.40 Cr in Q2 2026-27 (11% of that quarter's deposits)
Amount withdrawable, Form 4
₹4,09,41,83,806
Net amount withdrawable, Form 4
₹4,01,01,83,806
Not verified yet: Receivable, sold flats; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Local authority (Panchayat)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot