Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (HMDA) | Sanctioned 13 Jun 2023 | |
|---|---|---|
Disputes & cases
Builder: MANTOOR INFRASTRUCTURE PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: Telangana RERA project page and the documents filed there, as read by us.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
Filed with K-RERA: Details of encumbrances.
| Survey numbers | ||
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,17,754 sq m | |
| Power NOC (BESCOM) |
|---|
| Not verified yet |
| Fire NOC | Not verified yet | |
|---|---|---|
| Environmental clearance | Not verified yet | |
|---|---|---|
| Airport height NOC | Not verified yet | |
|---|---|---|
| Pollution board (CFE) | Not verified yet | |
|---|---|---|
| RERA extensions | Granted · Approved 29 Sep 2026 | |
|---|---|---|
| RERA completion date | 12 Jun 2028 |
1BHK 45.3%2BHK 22.8%Ground floor 2BHK 14.4%First floor 1BHK 13.6%32 other types 3.9%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1 | 2 | Not filed |
| 1 b hk | 1 | Not filed |
| 1BHK | 1,291 | Not filed |
| 1BHK | 13 | Not filed |
| 1q bhk | 1 | Not filed |
| 2 | 1 | Not filed |
| 2 b hk | 1 | Not filed |
| 2 bhhk | 2 | Not filed |
| 2BHK | 650 | Not filed |
| 2BHK | 1 | Not filed |
| Firat floor 1BHK | 1 | Not filed |
| First fllor 1BHK | 1 | Not filed |
| First flooor 1BHK | 2 | Not filed |
| First floor | 5 | Not filed |
| First floor 1BHK | 8 | Not filed |
| First floor 1BHK | 388 | Not filed |
| First floor 2BHK | 2 | Not filed |
| First floor1BHK | 5 | Not filed |
| First floorv 1BHK | 1 | Not filed |
| First loor 1BHK | 1 | Not filed |
Map of mapped waterways within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Nearest mapped waterway or drain | about 1.5 km, stream | |
|---|---|---|
| Nearest mapped inland water body | about 0.5 km, PATANCHERU CHERUVU | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Internal Roads & Footpaths : · Water Supply : · Sewerage (Chamber, Lines, Septic Tank , STP) : · Storm Water Drains : · Water Conservation, Rain water Harvesting : · Electrical Meter Room, Sub-Station, Receiving Station : | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not started | |
| Club house | Not verified yet | |
| Completion | Not verified yet | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 12 Jun 2028 | |
Map of mapped waterways and water bodies within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest mapped waterway or drain | about 1.5 km, stream | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Rajiv Gandhi International Airport | 36.5 |
| Abids | 26.5 |
| Secunderabad Junction railway station | 27 |
| HITEC City | 15.5 |
| Financial District, Hyderabad | 15 |
| Landfill or waste transfer station | None mapped within 3 km | |
|---|---|---|
| Sewage treatment plant | None mapped within 3 km | |
| Quarry | None mapped within 3 km | |
| Crematorium | None mapped within 3 km | |
| Prison | None mapped within 3 km | |
| Electrical substation | about 1 km |