Residential appartment... Neatly maintained... Enough parking space... Good one..!! 👍👍
Overview
Nava Brindavanam
Overview
Nava Brindavanam
Overview
Nava Brindavanam
Overview
Photo: kapil alvaTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 28 Jul 2022 · No. BBMP/CC/5213/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats of 2BHK · avg 61 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹2.72 Cr 39.9%Development · ₹4.10 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 28 Jul 2022 | |
| Escrow bank | HDFC · kalyan Nagar |
Data room
113 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Residential appartment... Neatly maintained... Enough parking space... Good one..!! 👍👍
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nava Brindavanam in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 30 Mar 2023 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 87-72-51 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats of 2BHK | 27 | 654 |
| Magnolia Delight | about 3 km | Locked | |
|---|---|---|---|
| Legacy Saviero | about 4 km | Locked | |
| Lodha Mirabelle | about 4 km | Locked | |
| Mirabelle Phase 2 | about 4 km | Locked | |
| Vkk Grand | about 4.5 km | Locked | |
| Brr North Excellency Phase I | about 5 km | Locked | |
| Ranka Iris | about 5.5 km | Locked | |
| Sumadhura Solea | about 5.5 km | Locked | |
| Sumadhura Epitome | about 6 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 6 km | Locked | |
| Cumins Sanctum | about 6.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 6.5 km | Locked |
| Nava Brindavanam This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Legacy Saviero | about 4 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Lodha Mirabelle | about 4 km | 30 Jun 2028 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, THAMMANA LAYOUT NEAR LINGARAJAPURA, |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kacharakanahalli Lake |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.15 (31 covered spaces for 27 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Dec 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 1 Dec 2022 |
| Building heights, fire NOC | 11.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 50 sq m |
|---|
| Architect's certificate, registration | Dated 26 Jun 2023 · site inspected 19 Jun 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 24 Jan 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹6.83 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹4.10 Cr |
| Escrow bank | HDFC · kalyan Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 96% (418 of 437) |
| Locked |
| Mirabelle Phase 2 | about 4 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Vkk Grand | about 4.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Brr North Excellency Phase I | about 5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 579 | |
| Booked | 304 of 579 (53%) | |
| Unsold | 275 | |
| Booked a month, pooled | 7 flats | |
| Months to sell, pooled | 39 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 3.5 km, Swami Vivekananda Road | |
| Metro, under construction | about 1 km, Venkateshpura |
| Kempegowda Airport | 28 | 22.5 |
| MG Road (CBD) | 6.5 | 5 |
| Manyata Tech Park | 4.5 | 3.5 |
| ITPL, Whitefield | 16 | 12.5 |
| Ecospace, Bellandur ORR | 20.5 | 11.5 |
| Electronic City Ph 1 | 26.5 | 20 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the south, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the south, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Raheja Mansion Substation on OpenStreetMap |