Had good experience with ceyone RMs ,and a great project with the best villa and amenities.
Overview
Nexon Travenza
Part ofNexon Travenza2 phases
Overview
Nexon Travenza
Part ofNexon Travenza2 phases
Overview
Nexon Travenza
Part ofNexon Travenza2 phases
Overview
Part ofNexon Travenza2 phases
Photo: Nexon TravenzaTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 81 | ||||
| 81/2 | 5 Sep 2009Deputy Commissioner, Bangalore Rural District | |||
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 19 Apr 2025 · No. STRRPA/TP/LAO/08/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Rent per sq ft, 3 km | ₹37.6 /mo, as listed · 5 listings with a size |
|---|
Location & risks
Construction & progress
Developer
Land · ₹2.41 Cr 19.2%Development · ₹10.17 Cr 80.8%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 20 Nov 2025 | |
| Building plan | Sanctioned 19 Apr 2025 | |
| Escrow bank | HDFC · Hoskote |
Data room
220 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 6 filed survey numbers matched, 5 could not be read.
Had good experience with ceyone RMs ,and a great project with the best villa and amenities.
Good connectivity, Nice location well designed floor plan with good space
We visited Nexon Travenza recently and the overall planning of the project really stood out. Among the premium Villas in East Bengaluru, this project feels thoughtfully designed with spacious multi-level homes that give a proper independent…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nexon Travenza in the interactive atlas
| No sale deed |
| 5 May 2025E Khatha · Panchayat Office |
| 9 Guntas |
| 81/2 | 5 Sep 2009DC | No sale deed | 15 Feb 2023A Khatha · Panchayatraj | 20 Guntas |
|---|
| 81/2 | 5 Sep 2009DC | No sale deed | 17 Jun 2025A Khatha · Panchayatraj | 29 Guntas |
|---|
| 81/4 | 3 Jun 2024DC | No sale deed | 19 Jun 2024A Khatha · Panchyath Raj | 30.5 Guntas |
|---|
| Survey 82 | ||||
|---|---|---|---|---|
| 82/8Old Sy. No.82/3 | 3 Apr 2023DC | No sale deed | 24 May 2023A Khatha · Panchayat Raj | 6.5 Guntas |
| 82/10Old Sy. No.82/4 | 3 Apr 2023Dedputy Commensionar | No sale deed | 24 May 2023E Khatha · Panchyathi Raj | 6.5 Guntas |
K-RERA filing, land schedule
The whole project
Transfer of the land
Title deed executed
ಕಸಬಾ hobli; ಕಸಬಾ hobli
Title deed filed with K-RERA, p. 1 · See it in Documents
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/LAO/08/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/111225/008327
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 20 Nov 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 8 of the encumbrance certificate. Filed with K-RERA: EC 81-2 9G & 20G, 8 pages, English.
Page 1
Page 1 of 6 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 6 pages.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 6 filed survey numbers matched, 5 could not be read.
| Survey numbers | 81/2 (9 Guntas), 81-2 (20 Guntas), 81-2 (29 Guntas), 81/4, 82/8 (Old Sy. No.82/3), 82/10 (Old Sy. No.82/4) | |
|---|---|---|
| Khata | E Khatha · Panchayat Office · 5 May 2025; A Khatha · Panchayatraj · 15 Feb 2023; A Khatha · Panchayatraj · 17 Jun 2025; and 3 more | |
| Title deed | Sy 81/2, Dodda Gattiganabbe village, Kasaba hobli, Hoskote taluk | |
| Title deed | Sy 82/3; 82/8, Doddagattiganabbe village, Kasaba hobli, Hoskote taluk | |
| Title deed | Sy 81/2, Dodda Gattiganabbe village, Kasaba hobli, Hoskote taluk | |
| Title deed | Consideration ₹73.0 L · Dodda Gattiganabbe village, Kasaba hobli, Hoskote taluk | |
| Title deeds | And 3 more read from the filing |
| Sy. No. 81/4 | 1 | 10 guntas | 31 guntas | 20 guntas | Differs: 21 guntas apart | 0 | ||
| Sy. No. 81/2 | Not read yet | 0 | ||||||
| Sy. No. 82/8 | Not read yet | 0 | ||||||
| Sy. No. 82/10 | Not read yet |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 25 Aug 2031 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 81/2 (9 Guntas) | Converted 5 Sep 2009 · Deputy Commissioner, Bangalore Rural District | |
| Sy 81-2 (20 Guntas), 81-2 (29 Guntas) | Converted 5 Sep 2009 · DC | |
| Sy 81/4 | Converted 3 Jun 2024 · DC | |
| Sy 82/8 (Old Sy. No.82/3) | Converted 3 Apr 2023 · DC | |
| Sy 82/10 (Old Sy. No.82/4) | Converted 3 Apr 2023 · Dedputy Commensionar | |
| Survey numbers | 81/2 (9 Guntas) · 81-2 (20 Guntas) · 81-2 (29 Guntas) · 81/4 · 82/8 (Old Sy. No.82/3) · 82/10 (Old Sy. No.82/4) |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 28 (22 with an approximate location) | |
|---|---|---|
| Plots in them | 10,212 | |
| Booked | 4,932 of 10,212 (48%) | |
| Unsold | 5,280 | |
| Booked a month, pooled | 183 plots | |
| Months to sell, pooled | 25 months |
Map of the ground within about 950 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest high-tension line | Nearest high-tension line: 220 kV, 410 m from the site | Clear |
|---|---|---|
| Nearest government-flagged flood location | 4.8 km, SIDDHARTHA LAYOUT KADUGODI | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 980 m to the west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 200 m to the north, an unnamed water body |
As the promoter reported it
| Internal roads | 55% | |
|---|---|---|
| Completion | 47% | |
| Completion, accountant | 48.5% of the estimated cost spent |
| RERA completion date | 25 Aug 2031 | |
|---|---|---|
| Work began, as filed | 19 Apr 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 |
| Estimated cost, at registration | ₹12.58 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹10.86 Cr | |
| Cost incurred | ₹5.26 Cr (48.5% of the Form 4 Q2 2026-27 estimate) |
| Escrow bank | HDFC · Hoskote | |
|---|---|---|
| Designated account, collected | ₹3.5 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.5 L in Q2 2026-27 | |
| Share of collections deposited in escrow | 100% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 0 |
Map of storm drains, lakes and government-flagged flood locations within about 950 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 2.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 980 m to the west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Ground level | 871 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.4 km, Whitefield | |
| Metro, under construction | 11.9 km, Doddanekundi |
| Kempegowda Airport | 36.9 | 36 | 20.8 |
| MG Road (CBD) | 30.3 | 28 | 21.4 |
| Manyata Tech Park | 29.8 | 30 | 18.6 |
| ITPL, Whitefield | 10.8 | 12 | 7.7 |
| Ecospace, Bellandur ORR | 21.4 | 25 | 16.8 |
| Electronic City Ph 1 | 35.1 | 40 | 24.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |