Title & ownership
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 2 Apr 2025 · No. STRRPA/TP/CC/268/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 2 Apr 2025 | |
| Escrow bank | HDFC · SOMPURA BRANCH |
Data room
144 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Onyx in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC | KSFES/NOC/319/2023 · issued 11 Jan 2024 · building height 44.95 m | Clear |
|---|
| Environmental clearance | SEIAA 139 CON 2023 · EC identification no. EC23B038KA110261 · issued 17 Oct 2023 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2031 |
| Land conversion | Converted 23 Sep 2015 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 180 · 181 · 182 · 183 · 185 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK type 02 · avg 116 m² 11.5%3BHK type 05 · avg 116 m² 11.5%2.5BHK type 01 · avg 92 m² 11.5%2.5BHK type 02 · avg 92 m² 11.5%12 other types 53.8%
| 1.5BHK | 6 | 4,564 |
| 2BHK | 6 | 6,060 |
| 2.5BHK type 01 | 72 | 71,268 |
| 2.5BHK type 02 | 72 | 71,268 |
| 2.5BHK type 02 a | 6 | 5,931 |
| 3BHK type 01 | 72 | 92,591 |
| 3BHK type 01 a | 6 | 7,707 |
| 3BHK type 02 | 72 | 89,523 |
| 3BHK type 03 | 72 | 92,591 |
| 3BHK type 03 a | 6 | 7,707 |
| 3BHK type 04 | 72 | 92,591 |
| 3BHK type 04 a | 6 | 7,707 |
| 3BHK type 05 | 72 | 89,523 |
| 3BHK type 05 a | 6 | 7,459 |
| 3BHK type 06 | 72 | 92,591 |
| 3BHK type 06 a | 6 | 7,707 |
| Sold, Q2 2026-27 | 90 / 624 | |
|---|---|---|
| Unsold, Q2 2026-27 | 534 | |
| Months to sell, derived from filed bookings | 98 months |
| Vasudharini Nest | about 1.5 km | Locked | |
|---|---|---|---|
| Royal Nest | about 1.5 km | Locked | |
| Leafy Avenue | about 2.5 km | Locked | |
| Coevolve Florenza | about 3.5 km | Locked | |
| Sowparnika Olivia Nest | about 3.5 km | Locked | |
| Leafy Delight | about 4 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 5 km | Locked | |
| Suyug's Saffron | about 5.5 km | Locked | |
| Engrace Vista | about 6.5 km | Locked | |
| Nambiar District 25 Phase 2 | about 6.5 km | Locked | |
| Engrace 4 | about 7 km | Locked | |
| Engrace 3 | about 7 km | Locked |
| Onyx This project | This project is the point the others are measured from | 31 Mar 2031 | 14% (90 of 624) | Not verified yet |
|---|---|---|---|---|
| Vasudharini Nest | about 1.5 km | 31 Mar 2028 | 31% (26 of 84) | Locked |
| Royal Nest | about 1.5 km | 30 Jun 2028 | 9% (9 of 104) | Locked |
| Leafy Avenue | about 2.5 km | 31 Dec 2028 | 11% (8 of 71) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9.5 km, Varthur police station |
|---|
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Covered parking per unit | 1.00 (625 covered spaces for 624 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 1 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Jun 2030 | |
| Club house | Not started | |
| Completion | 21% | |
| Completion, accountant | 17.8% of the estimated cost spent |
| Schedule end | 31 Mar 2031 | |
|---|---|---|
| RERA completion date | 31 Mar 2031 | |
| Work began, as filed | 1 Jul 2025 |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44.95 m filed, 6 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 472.67 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/319/2023 · issued 11 Jan 2024 · building height 44.95 m | |
| Environmental clearance | SEIAA 139 CON 2023 · EC identification no. EC23B038KA110261 · issued 17 Oct 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 20 May 2025 · site inspected 15 May 2025 | |
| Engineer's certificate, registration | Dated 20 May 2025 | |
| Chartered accountant's certificate, registration | Dated 20 Jun 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹12.87 Cr 3.3%Development · ₹372.00 Cr 96.7%
| Estimated cost, at registration | ₹384.87 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹325.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹384.87 Cr, same as the filing | |
| Cost incurred | ₹68.59 Cr (17.8% of the estimate) |
Sold (90) 14.4%Unsold (534) 85.6%
| Sold, Q3 2025-26 | 41 / 352 · 311 available | |
|---|---|---|
| Sold, Q4 2025-26 | 57 / 560 · 503 available | |
| Sold, Q1 2026-27 | 71 / 521 · 450 available | |
| Sold, Q2 2026-27 | 90 / 624 · 534 available | |
| Unsold, Q2 2026-27 | 534 | |
| Sold in Q4 2025-26 | 16 | |
| Sold in Q1 2026-27 | 14 | |
| Sold in Q2 2026-27 | 19 |
| Escrow bank | HDFC · SOMPURA BRANCH | |
|---|---|---|
| Designated account, collected | ₹8.31 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.19 Cr in Q2 2026-27 (74% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Coevolve Florenza | about 3.5 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
|---|
| Sowparnika Olivia Nest | about 3.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
|---|
| Leafy Delight | about 4 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
|---|
| Projects within 4 km, counted | 28 (28 with an approximate location) | |
|---|---|---|
| Flats in them | 4,041 | |
| Booked | 1,998 of 4,041 (49%) | |
| Unsold | 2,043 | |
| Booked a month, pooled | 44 flats | |
| Months to sell, pooled | 38 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Mugaluru Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 13 km, Channasandra | |
| Metro, under construction | about 14.5 km, Kodibeesanahalli |
| Kempegowda Airport | 52.5 | 36.5 |
| MG Road (CBD) | 31 | 25.5 |
| Manyata Tech Park | 35.5 | 27.5 |
| ITPL, Whitefield | 19.5 | 14 |
| Ecospace, Bellandur ORR | 22 | 15.5 |
| Electronic City Ph 1 | 28 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |