Excellent build, quality materials used, along with generous amenities.
Overview
Opera Primus
Overview
Opera Primus
Overview
Opera Primus
Overview
Photo: KWICK 7Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 3 Sep 2022 · No. PRJ/3239/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 64 m² 58.3%3BHK · avg 95 m² 41.7%
Location & risks
Construction & progress
Developer
Land · ₹6.58 Cr 30.6%Development · ₹14.94 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 3 Sep 2022 | |
| Escrow bank | Union Bank of India · JAYANAGAR 4TH BLOCK |
Data room
155 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Excellent build, quality materials used, along with generous amenities.
Peaceful elegant design surrounded with greenery and Top floor view is good
The architecture of this apartment is quite exquisite. The flats are very spacious and the place is equipped with various amenities such as a functional swimming pool and a gym. The location of this apartment was also strategically placed…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Opera Primus in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 23 Mar 2022 · Deputy Commissioner office Bangalore | |
|---|---|---|
| Survey numbers | Sy No -29/4 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 28 | 692 |
| 3BHK | 20 | 1,026 |
| Aqua Vista | about 0.5 km | Locked | |
|---|---|---|---|
| Iris Courtyard | about 1 km | Locked | |
| Lodha Azur | about 2 km | Locked | |
| Azur Tower D | about 2 km | Locked | |
| Platinum Landmark | about 2.5 km | Locked | |
| Azur Phase 2 | about 3.5 km | Locked | |
| Sattva Forest Ridge | about 3.5 km | Locked | |
| Pacific Legacy | about 4.5 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 4.5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 4.5 km | Locked | |
| Dhiraan Lotus | about 5 km | Locked | |
| Srivara Vasudha | about 5 km | Locked |
| Opera Primus This project | This project is the point the others are measured from | 31 Dec 2027 | – | Not verified yet |
|---|---|---|---|---|
| Aqua Vista | about 0.5 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Iris Courtyard | about 1 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Lodha Azur | about 2 km | 30 Oct 2029 | 97% (236 of 244) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Kallena Agrahara in Arekere |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kalena Agrahara Lake |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym | |
|---|---|---|
| Covered parking per unit | 1.13 (54 covered spaces for 48 units) | |
| Power backup | Not declared |
| Completion | Completed, occupancy certificate 26 Dec 2024 |
|---|
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 1 May 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Completion date, agreement | 31 Dec 2027 | |
| Work began, as filed | 12 Dec 2022 |
| Building heights, fire NOC | 14.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Architect's certificate, registration | Dated 28 Nov 2022 · site inspected 22 Nov 2022 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 15 Dec 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹21.52 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹14.19 Cr |
Sold (16) 33.3%Unsold (32) 66.7%
| Flats sold, at completion | 16 | |
|---|---|---|
| Flats unsold, at completion | 32 | |
| Flats in the phase | 48 |
| Escrow bank | Union Bank of India · JAYANAGAR 4TH BLOCK |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Azur Tower D | about 2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Platinum Landmark | about 2.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|
| Azur Phase 2 | about 3.5 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
|---|
| Projects within 4 km, counted | 41 (41 with an approximate location) | |
|---|---|---|
| Flats in them | 10,959 | |
| Booked | 7,944 of 10,959 (72%) | |
| Unsold | 3,015 | |
| Booked a month, pooled | 243 flats | |
| Months to sell, pooled | 12 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 4 km, Konankunte Cross | |
| Metro, under construction | about 0.5 km, Kalena Agrahara |
| Kempegowda Airport | 46 | 39 |
| MG Road (CBD) | 13 | 12.5 |
| Manyata Tech Park | 22 | 20 |
| ITPL, Whitefield | 29 | 20.5 |
| Ecospace, Bellandur ORR | 16.5 | 11.5 |
| Electronic City Ph 1 | 15.5 | 9.5 |
| Landfill or waste transfer station | about 2 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the north-east |