Park South
Overview
Park South
Overview
Park South
Overview
Photo: gopinath aTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
special deputy commissioner Bangalore · Survey 4800/77/1698/65/16
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Defect liability | 1 year |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 84 m² 75%3BHK 25%
Location & risks
Construction & progress
Developer
Land · ₹7.66 Cr 30.4%Development · ₹17.54 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 30 Mar 2022 | |
| Escrow bank | ICICI Bank · jp nagar 4th phase brnch |
Data room
145 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
A beautiful aesthetic project which I liked well
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Park South in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹4.6 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹4.6 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Sale deed
Survey 4800/77/1698/65/16
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹2.3 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Approval or registration
Khata issued
A Khatha · BBMP · Survey 4800/77/1698/65/16
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/AD.COM/BMH/1748/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/220623/006003
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 4800/77/1698/65/16 | |
|---|---|---|
| Land extent, Sy 4800/77/1698/65/16 | 1,845 sq m | |
| Land area of this registration | 1,834 sq m | |
| Khata | A Khatha · BBMP · 25 Feb 2022 | |
| Sale deed | Dated 31 Mar 2001 | |
| Title deed | Consideration ₹4.6 L |
| Joint development agreement number | 160 of Book 1, 2021-22 |
|---|
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 30 Mar 2022 · No. BBMP/AD.COM/BMH/1748/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-121285 · issued 21 Oct 2022 · valid until 20 Oct 2027 | Clear |
| Water and sewerage NOC (BWSSB) | issued 29 Apr 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Dec 2024 |
| Land conversion | Converted 3 Mar 1989 · special deputy commissioner Bangalore | |
|---|---|---|
| Survey numbers | 4800/77/1698/65/16 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 24 | 21,732 |
| 3BHK | 8 | 9,408 |
| Iris Courtyard | about 0.5 km | Locked | |
|---|---|---|---|
| Lodha Azur | about 1.5 km | Locked | |
| Aqua Vista | about 2 km | Locked | |
| Azur Tower D | about 2 km | Locked | |
| Pacific Legacy | about 3 km | Locked | |
| Platinum Landmark | about 3.5 km | Locked | |
| Azur Phase 2 | about 3.5 km | Locked | |
| Sattva Forest Ridge | about 4 km | Locked | |
| Dhiraan Lotus | about 4.5 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5 km | Locked | |
| Srivara Vasudha | about 5 km | Locked |
| Park South This project | This project is the point the others are measured from | 30 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Iris Courtyard | about 0.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Lodha Azur | about 1.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
| Aqua Vista | about 2 km | 31 Dec 2024 | 96% (173 of 181) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, RR Layout in Arekere & Hulimavu junction |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Covered parking per unit | 0.94 (30 covered spaces for 32 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 29 Nov 2024 |
|---|
| Schedule end | 29 Nov 2024 | |
|---|---|---|
| RERA completion date | 30 Dec 2024 | |
| Work began, as filed | 1 Nov 2022 |
| Building heights, fire NOC | 14.8 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 3 sq m |
|---|
| Engineer's certificate, registration | Dated 18 Mar 2023 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 31 Oct 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹25.20 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹15.00 Cr |
Sold (2) 6.3%Unsold (30) 93.8%
| Flats sold, at completion | 2 | |
|---|---|---|
| Flats unsold, at completion | 30 | |
| Flats in the phase | 32 |
| Escrow bank | ICICI Bank · jp nagar 4th phase brnch | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Azur Tower D | about 2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Pacific Legacy | about 3 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
|---|
| Platinum Landmark | about 3.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|
| Projects within 4 km, counted | 41 (41 with an approximate location) | |
|---|---|---|
| Flats in them | 9,244 | |
| Booked | 6,149 of 9,244 (67%) | |
| Unsold | 3,095 | |
| Booked a month, pooled | 150 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Yelachenahalli | |
| Metro, under construction | about 0.5 km, Hulimavu |
| Kempegowda Airport | 44.5 | 37.5 |
| MG Road (CBD) | 11.5 | 10.5 |
| Manyata Tech Park | 20.5 | 18.5 |
| ITPL, Whitefield | 27.5 | 19.5 |
| Ecospace, Bellandur ORR | 15 | 11 |
| Electronic City Ph 1 | 19 | 10.5 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | about 2 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |