Overview
Pavani Sarovar Phase 2
Overview
Pavani Sarovar Phase 2
Overview
Pavani Sarovar Phase 2
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 12 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 12 pages, not in English.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Aug 2019 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | 25% of the sale consideration and the cost of construction |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹24.23 Cr 32.5%Development · ₹50.21 Cr 67.5%
Loan & collateral
| Escrow bank | ICICI Bank · AECS Layout |
|---|
Data room
41 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Pavani Sarovar Phase 2 is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 9,083 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 1 year |
|---|
| Coevolve Misty Shores | about 1 km, to a locality centre | Locked |
|---|
| Vaswani Starlight | about 1 km, to a locality centre | Locked |
|---|
| Reflections 66 | about 1.5 km, to a locality centre | Locked |
|---|
| Axis Ekatva | about 1.5 km, to a locality centre | Locked |
|---|
| Assetz 66 & Shibui | about 2 km, to a locality centre | Locked |
|---|
| Garuda Grand | about 3.5 km, to a locality centre | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 3.5 km, to a locality centre | Locked |
|---|
| 2g Tula | about 3.5 km, to a locality centre | Locked |
|---|
| Poetry Of Earth | about 4 km, to a locality centre | Locked |
|---|
| Inspira Infinity | about 4 km, to a locality centre | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 4 km, to a locality centre | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 4 km, to a locality centre | Locked |
|---|
| Pavani Sarovar Phase 2 This project | This project is the point the others are measured from | 31 Aug 2019 | – | Not verified yet |
|---|---|---|---|---|
| Coevolve Misty Shores | about 1 km, to a locality centre | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Vaswani Starlight | about 1 km, to a locality centre | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Reflections 66 | about 1.5 km, to a locality centre | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Axis Ekatva | about 1.5 km, to a locality centre | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Assetz 66 & Shibui | about 2 km, to a locality centre | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Garuda Grand | about 3.5 km, to a locality centre | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, Nallurhalli Lake |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | about 2.5 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
| Schedule end | 31 Jul 2019 | |
|---|---|---|
| RERA completion date | 31 Aug 2019 | |
| Work began, as filed | 25 Jul 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹74.44 Cr |
|---|
| Escrow bank | ICICI Bank · AECS Layout |
|---|
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed village; basemap © OpenStreetMap contributors
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed village; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, tertiary drain |
|---|