Overview
Phoenix Kessaku
Overview
Phoenix Kessaku
Overview
Phoenix Kessaku
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Approvals
| Fire NOC | GBC(1)190/2011 | Clear |
|---|---|---|
| Airport height NOC | NOC ID BIAL/SOUTH/B/020520/444225 | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹60.22 Cr
Loan & collateral
| Escrow bank | Standard Chartered Bank · M G Road |
|---|
Data room
126 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Phoenix One Bangalore WestCompleted (regulator flag) | Phoenix Group | Apartment | 1,890–3,608 sqft | Completed |
| Rathod VatikaCompleted (regulator flag) | Individual promoter (named in the filing) | Mixed development | – | Completed |
All 2 other projects in Rajajinagar, A to Z. Status is taken from each project's own filing.
All 3 projects in Rajajinagar → · Phoenix Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Phoenix Kessaku in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 67,488 sq m |
|---|
| RERA extensions | Granted · Approved 10 Aug 2022 | |
|---|---|---|
| RERA completion date | 30 Dec 2021 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Birla Tisya, price locked.
| Renaissance Srichakra | about 1 km | Locked | |
|---|---|---|---|
| Vista Padmalaya | about 1.5 km | Locked | |
| Birla Tisya | 3.4 km | Locked | |
| Royal Enclave | about 4 km | Locked | |
| Magnolia Delight | about 5.5 km | Locked | |
| Sri Rama Enclave | about 6.5 km | Locked | |
| Vista Svara | about 6.5 km | Locked | |
| Vruksha Greens | 7.5 km | Locked | |
| Rubby Castle 1 | about 8 km | Locked | |
| Assetz Soho & Sky | 8.1 km | Locked | |
| Cumins Sanctum | about 8.5 km | Locked | |
| Mirabelle Phase 2 | about 9 km | Locked |
| Phoenix Kessaku This project | This project is the point the others are measured from | 30 Dec 2021 | – | Not verified yet |
|---|---|---|---|---|
| Renaissance Srichakra | about 1 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Vista Padmalaya | about 1.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Birla Tisya | 3.4 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Royal Enclave | about 4 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Magnolia Delight | about 5.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Sri Rama Enclave | about 6.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Rent, 3BHK, 3 km | ₹49,000 /mo · 25 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹25,000 /mo · 57 listings | |
| Rent, 1BHK, 3 km | ₹11,500 /mo · 46 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 62 listings with a size |
| Projects within 4 km, counted | 10 (6 with an approximate location) | |
|---|---|---|
| Flats in them | 1,439 | |
| Booked | 1,290 of 1,439 (90%) | |
| Unsold | 149 | |
| Booked a month, pooled | 12 flats | |
| Months to sell, pooled | 12 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest government-flagged flood location | 850 m, Near Yashavanthpur TTMC |
| Nearest storm drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 210 m to the north-east, Brigade Gateway Lake |
| Completed, occupancy certificate 14 Jan 2022 |
| Schedule end | 30 Jun 2022 | |
|---|---|---|
| RERA completion date | 30 Dec 2021 | |
| Work began, as filed | 30 Nov 2014 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)190/2011 |
|---|
| Estimated cost, at registration | ₹187.82 Cr |
|---|
Sold (2) 3.4%Unsold (56) 96.6%
| Flats sold, at completion | 2 | |
|---|---|---|
| Flats unsold, at completion | 56 | |
| Flats in the phase | 58 |
| Escrow bank | Standard Chartered Bank · M G Road |
|---|
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 5 (5 completed, 0 extended) | |
| Average schedule slip | 16 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 30 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 920 m above sea level, plus or minus 4 m | |
| Metro, operational | 510 m, Sandal Soap Factory | |
| Metro, under construction | 5.6 km, Hebbal |
| Kempegowda Airport | 35.2 | 38 | 26.7 |
| MG Road (CBD) | 10.0 | 12 | 6.4 |
| Manyata Tech Park | 12.1 | 17 | 8.1 |
| ITPL, Whitefield | 27.3 | 30 | 20.0 |
| Ecospace, Bellandur ORR | 23.6 | 30 | 16.6 |
| Electronic City Ph 1 | 27.9 | 34 | 23.2 |
| Landfill or waste transfer station | 1.3 km to the north-east | |
|---|---|---|
| Sewage treatment plant | 650 m to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 20 m to the north |