Overview
Prestige Edwardian
Overview
Prestige Edwardian
Overview
Prestige Edwardian
Overview
Photo: Syed Muhammad Syed Hussaini| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 11 Campbell KrishviRegistered · no quarterly update yet | KRISHVI PROJECTS PRIVATE LIMITED | Apartment | 1,888 sqft carpet (as filed) | Dec 2026 |
| Aashrithaa Divine Phase - 2Completed (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| CelestiaLapsed · completion date passed | PYRAMID PROPERTIES | Apartment | – | May 2022 |
| Chartered 1956Active · 95% built | CHARTERED HOUSING PRIVATE LIMITED | Apartment | 2,988 sqft carpet (as filed) | Jun 2028 |
| Comfort VimalaprabhaLapsed · completion date passed | COMFORT BUILDERS & DEVELOPERS | Apartment | – | Sep 2024 |
| Df Silverline Queens TerracesCompleted · OC 18-07-2018 | DF SILVERLINE CONSTRUCTIONS | Apartment | 1,380 sqft carpet (as filed) | Completed |
| Embassy Habitat | Embassy Group | Apartment | 1,100–3,427 sqft | – |
| Emmanuel Ashley ParkLapsed · completion date passed | EMMANUEL ESTATES | Apartment | 831 sqft carpet (as filed) | Dec 2024 |
8 of 32 other projects in Vasanth Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Edwardian in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Vista Svara | about 3.5 km | Locked | |
|---|---|---|---|
| Renaissance Srichakra | about 4 km | Locked | |
| Magnolia Delight | about 4 km | Locked | |
| Vista Padmalaya | about 4 km | Locked | |
| Ranka Iris | about 5 km | Locked | |
| Birla Tisya | 6.3 km | Locked | |
| Century Regalia (Project 2) | 6.5 km | Locked | |
| Lodha Mirabelle | 7.7 km | Locked | |
| Mirabelle Phase 2 | about 7.5 km | Locked | |
| Aydin Infra Signature 3 | 8.2 km | Locked | |
| Adarsh Premia | 8.2 km | Locked | |
| Legacy Saviero | about 8.5 km | Locked |
| Prestige Edwardian This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Vista Svara | about 3.5 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Renaissance Srichakra | about 4 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Magnolia Delight | about 4 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Vista Padmalaya | about 4 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Ranka Iris | about 5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Birla Tisya | 6.3 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 59 listings | |
| Rent, 2BHK, 3 km | ₹30,000 /mo · 122 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 93 listings | |
| Rent per sq ft, 3 km | ₹30.9 /mo, as listed · 99 listings with a size |
| Projects within 4 km, counted | 21 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 560 | |
| Booked | 268 of 560 (48%) | |
| Unsold | 292 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 50 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest government-flagged flood location | 610 m, Miller Tank, |
| Nearest storm drain | 620 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 630 m to the south, an unnamed water body |
| K-RERA registrations under this promoter | 66 | |
|---|---|---|
| Marked completed | 37 | |
| Past promised date, not completed | 10 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 40 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 620 m to the west, tertiary drain | |
|---|---|---|
| Ground level | 925 m above sea level, plus or minus 4 m | |
| Metro, operational | 740 m, Cubbon Park | |
| Metro, under construction | 860 m, Shivaji Nagar |
| Kempegowda Airport | 33.7 | 34 | 26.4 |
| MG Road (CBD) | 2.5 | 4 | 1.4 |
| Manyata Tech Park | 8.7 | 12 | 7.0 |
| ITPL, Whitefield | 19.4 | 22 | 15.3 |
| Ecospace, Bellandur ORR | 18.5 | 25 | 11.5 |
| Electronic City Ph 1 | 22.8 | 29 | 18.7 |
| Landfill or waste transfer station | 830 m to the south | |
|---|---|---|
| Sewage treatment plant | 1.1 km to the east, named ETP on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 710 m to the north-east, named C Station on OpenStreetMap |