| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Avyuktha Infratech
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Survey numbers | 280-III/11/C1, 280-III-11/B1P3 as per Khatha No. 10014315/ 280-III-11-B1P3 as per Conversion Order No. ADS/LNA/CR/353/2010-11, 280-III-B2 as per Khatha, 280-III-11-C2P as per Khatha No 10012093 / 280-111-11-C2 as per Conversion Order No LCUM10038091, 283/P as per Khatha No 10012093/ 283-111-11* as per Conversion Order no LCUM10038091, Survey Number | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,263 sq m | |
| Building plan (Mangaluru Urban Development Authority) | Sanctioned 14 May 2024 · No. E2/BA 37/2023-24 (167349) | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Not verified yet | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 15 Feb 2029 |
Residential · avg 55 m² 33.3%3BHK 33.3%2BHK 24.2%1BHK 9.1%
| 1BHK | 6 | Not filed |
| 2BHK | 16 | Not filed |
| 3BHK | 22 | Not filed |
| Residential | 22 | 13,046 |
| Sold, Q2 2026-27 | 23 / 46 | |
|---|---|---|
| Unsold, Q2 2026-27 | 23 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 9 months) |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Weather Proof work(tile,concrete) · Wardrobe, Showcase, Kitchen cabinet, Puja work · Elevation work · Water Supply · Water conservation/rain water harvesting/recharge of ground water · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Storm water drains · Use of renewable energy · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Parks · Power Backup · Piped Gas · Water and Sanitation · Air Conditioning · Staircases · Lifts · Corridor/Lobbies · Common entrance and exit for the building/common portico/foyer/verandah · Basement · Terrace · Open parking areas · Water conservation and renewable energy · Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Weather Proof work(tile,concrete) · Wardrobe, Showcase, Kitchen cabinet, Puja work · Elevation work · Water Supply · Water conservation/rain water harvesting/recharge of ground water · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Storm water drains · Use of renewable energy · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Parks · Power Backup · Piped Gas · Water and Sanitation · Air Conditioning · Staircases · Lifts · Corridor/Lobbies · Common entrance and exit for the building/common portico/foyer/verandah · Basement · Terrace · Open parking areas · Water conservation and renewable energy | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 90% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 15 Feb 2029 | |
| Work began, as filed | 15 Sep 2024 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
The promoter filed this with the registration.
| Estimated cost | ₹18.28 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (23) 50%Unsold (23) 50%
| Sold, Q3 2025-26 | 22 / 46 · 24 available | |
|---|---|---|
| Sold, Q4 2025-26 | 22 / 46 · 24 available | |
| Sold, Q1 2026-27 | 22 / 46 · 24 available | |
| Sold, Q2 2026-27 | 23 / 46 · 23 available | |
| Unsold, Q2 2026-27 | 23 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | Axis Bank | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Withdrawn from the escrow account to date | ₹0 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 14 May 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |