Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 756 sq m | |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| BESCOM | Filed with the registration | |
| Fire NOC | Clear | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2023 |
2BHK 88.2%3BHK 11.8%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 15 | Not filed |
| 3BHK | 2 | Not filed |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Retaining wall (All types) · Plinth level Beam · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · RCC or MS Framed structure · Masonry construction: Bricks, Concrete blocks etc · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Weather Proof work(tile,concrete) · Painting · Elevation work · Internal and External work including landscapes as per santioned drawings · Water Supply · Sewage and Drainage System · Education/Health/Other public amenities · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Electricity · CCTV Surveillance · Power Backup · Water and Sanitation · Staircases · Lifts · Staircases and Lift lobbies, corridor,lobbies, corridor · Common entrance and exit for the building / common portico/foyer/verandah · Basement · Terrace · Outer Wall · Open parking areas and common storage spaces · Provision for lodging of management staff and security staff | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2023 | |
| Work began, as filed | 1 Apr 2021 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | ||
| Environmental clearance | Not verified yet | |
The promoter filed this with the registration.
| Estimated cost |
|---|
| ₹4.72 Cr |
| Cost incurred | Not verified yet | |
|---|---|---|
| Cost left | Not verified yet | |
|---|---|---|
| Collected from buyers | Not verified yet | |
|---|---|---|
| Receivable, sold flats | Not verified yet | |
|---|---|---|
| Land cost revision | Not verified yet | |
|---|---|---|
| Escrow bank | KOTAK MAHINDRA BANK | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | KOTAK MAHINDRA BANK |
|---|