Overview
Reliaable Residenza Crusher Series
Overview
Reliaable Residenza Crusher Series
Overview
Reliaable Residenza Crusher Series
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 1 Mar 2021 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Records searched to | 1 Mar 2021 | Review |
|---|---|---|
| Escrow bank | HDFC · Richmond Road |
Data room
65 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | 1 | – | Review |
Part of the full report. Unlock all 3 sections
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
All 279 projects in Electronic City → · RD Buildtech and Developers (Karnataka) Pvt ltd's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Reliaable Residenza Crusher Series in the interactive atlas
Page 1
Page 1 of 28 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 28 pages.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 3,035 sq m |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 13 Apr 2024 |
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 3.3 km, G K LAYOUT |
| Nearest storm drain | 270 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the north, an unnamed pond |
| RERA completion date | 13 Apr 2024 | Red flag |
|---|---|---|
| Work began, as filed | 13 Apr 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹3.30 Cr |
|---|
| Escrow bank | HDFC · Richmond Road |
|---|
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 9 | Review |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 3 (0 completed, 3 extended) | |
| Average schedule slip | 9 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 2.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 270 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 912 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.8 km, Infosys Foundation Konappana Agrahara | |
| Metro, under construction | 6.9 km, Ibbalur |
| Kempegowda Airport | 52.9 | 59 | 37.3 |
| MG Road (CBD) | 18.6 | 27 | 15.7 |
| Manyata Tech Park | 29.2 | 37 | 21.5 |
| ITPL, Whitefield | 23.2 | 28 | 14.5 |
| Ecospace, Bellandur ORR | 12.2 | 18 | 6.9 |
| Electronic City Ph 1 | 7.7 | 13 | 3.1 |
| Landfill or waste transfer station | 2.2 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | 2.7 km to the north-west, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 2.2 km to the south-west, named Tata P.P. Solar on OpenStreetMap |