Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: NEW HOMES REALITY
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 1 document filed with K-RERA, identity papers and photographs, are left out of this list.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Survey numbers | 555A/1, 556A/1, 556A/3, Survey Number | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,881 sq m | |
| Building plan (Hubballi Dharwad Municipal Corporation) | Sanctioned 19 Jan 2026 · No. HDW-LBPAS-54849/25-26/BP/14 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Not verified yet | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2031 |
Apartment · avg 125 m² 33.3%3BHK 31.7%2BHK 23.3%4BHK 11.7%
| 2BHK | 112 | Not filed |
| 3BHK | 152 | Not filed |
| 4BHK | 56 | Not filed |
| Apartment | 160 | 2,15,052 |
| Sold, Q2 2026-27 | 35 / 162 | |
|---|---|---|
| Unsold, Q2 2026-27 | 127 | |
| Months to sell, derived from filed bookings | 22 months |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Weather Proof work(tile,concrete) · Wardrobe, Showcase, Kitchen cabinet, Puja work · Elevation work · Water Supply · Sewage and Drainage System · Water conservation/rain water harvesting/recharge of ground water · Solid waste management and disposal · Electricity Supply Transformer and Sub Station · Sewerage Treatment Plant - STP · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Indoor Sports facility · Swimming Pool · Gym · Power Backup · Staircases · Lifts · Corridor/Lobbies · Common entrance and exit for the building/common portico/foyer/verandah · Basement · Terrace · Outer Wall · Water conservation and renewable energy · Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Weather Proof work(tile,concrete) · Wardrobe, Showcase, Kitchen cabinet, Puja work · Elevation work · Water Supply · Sewage and Drainage System · Water conservation/rain water harvesting/recharge of ground water · Solid waste management and disposal · Electricity Supply Transformer and Sub Station · Sewerage Treatment Plant - STP · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Indoor Sports facility · Swimming Pool · Gym · Power Backup · Staircases · Lifts · Corridor/Lobbies · Common entrance and exit for the building/common portico/foyer/verandah · Basement · Terrace · Outer Wall · Water conservation and renewable energy | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 18% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2031 | |
| Work began, as filed | 1 Mar 2026 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
The promoter filed this with the registration.
| Estimated cost | ₹73.76 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (35) 21.6%Unsold (127) 78.4%
| Sold, Q1 2026-27 | 18 / 162 · 144 available | |
|---|---|---|
| Sold, Q2 2026-27 | 35 / 162 · 127 available | |
| Unsold, Q2 2026-27 | 127 | |
| Sold in Q2 2026-27 | 17 |
| Escrow bank | Union Bank of India | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Withdrawn from the escrow account to date | ₹3,50,00,006 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 19 Jan 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India | |