Overview
Sankalp Windsor House
Overview
Sankalp Windsor House
Overview
Sankalp Windsor House
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 5 Aug 2021 · No. BBMP.AD.COMYLK/1457/2021 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 154 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹5.72 Cr 46.8%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 5 Aug 2021 | |
| Escrow bank | STATE BANK OF INDIA · KUVEMPUNAGAR |
Data room
112 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Century HorizonCompleted (regulator flag) | CENTURY STAR | Mixed development | – | Completed |
| Fortuna AcaciaLapsed · completion date passed | FortunaConstructions India Private Limited | Apartment | 1,985 sqft carpet (as filed) | Mar 2021 |
| Govianu Jodidhar AtlantisLapsed · completion date passed | Mahesh | Apartment | – | Jun 2025 |
| Hoysala Ace-IILapsed · completion date passed | Hoysala Projects Private Limited | Apartment | – | Jan 2020 |
| Kay Arr MaverickCompleted · OC 21-10-2020 | KAY ARR & CO | Apartment | – | Completed |
| L&T Elara CelestiaActive · 23% built | L&T Realty | Apartment | 1,503–3,735 sqft | 2030 |
| Ltcel Raintree Boulevard Cl 2Completed (regulator flag) | L&T Realty Developers Limited | Apartment | 1,296 sqft carpet (as filed) | Completed |
| Ltcel Raintree Boulevard Cl3Completed (regulator flag) | L&T Realty Developers Limited | Apartment | – | Completed |
8 of 14 other projects in Byatarayanapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sankalp Windsor House in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 20 Sep 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 1412 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 8 | 1,655 |
| Assetz Soho & Sky | about 1.5 km | Locked | |
|---|---|---|---|
| Cumins Sanctum | about 2 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 2.5 km | Locked | |
| Legacy Salvador | about 2.5 km | Locked | |
| Sri Rama Enclave | about 3 km | Locked | |
| Sumadhura Epitome | about 4 km | Locked | |
| Sumadhura Solea | about 4 km | Locked | |
| Godrej Aveline | about 4.5 km | Locked | |
| Sobha City Athena | about 4.5 km | Locked | |
| Mirabelle Phase 2 | about 4.5 km | Locked | |
| Lodha Mirabelle | about 4.5 km | Locked |
| Sankalp Windsor House This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Soho & Sky | about 1.5 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 2 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| 4square Park Sierra | about 2.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, LBSnagar Yelahanka |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (8 covered spaces for 8 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 8 Dec 2025 |
|---|
| Schedule end | 31 Dec 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 29 Jan 2022 |
| Building heights, fire NOC | 14 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 9 sq m |
|---|
| Architect's certificate, registration | Dated 12 Feb 2022 · site inspected 29 Jan 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 13 Feb 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹12.22 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹6.50 Cr |
Sold (4) 50%Unsold (4) 50%
| Flats sold, at completion | 4 | |
|---|---|---|
| Flats unsold, at completion | 4 | |
| Flats in the phase | 8 |
| Escrow bank | STATE BANK OF INDIA · KUVEMPUNAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2029 |
| 8% (14 of 170) |
| Locked |
| Assetz Soho & Sky Phase 1b | about 2.5 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| Legacy Salvador | about 2.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| Sri Rama Enclave | about 3 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 46 (46 with an approximate location) | |
|---|---|---|
| Flats in them | 11,786 | |
| Booked | 6,889 of 11,786 (58%) | |
| Unsold | 4,897 | |
| Booked a month, pooled | 140 flats | |
| Months to sell, pooled | 35 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority (BBMP YELAHANKA) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Yeshwantpur | |
| Metro, under construction | about 0.5 km, Jakkur Cross |
| Kempegowda Airport | 22.5 | 18.5 |
| MG Road (CBD) | 14 | 11.5 |
| Manyata Tech Park | 8.5 | 4.5 |
| ITPL, Whitefield | 25.5 | 18.5 |
| Ecospace, Bellandur ORR | 29.5 | 19.5 |
| Electronic City Ph 1 | 34 | 28 |
| Landfill or waste transfer station | about 0.5 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Yelahanka Phase I 10 MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named L&T Substation on OpenStreetMap |