Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (Local Planning Authority) | Sanctioned 11 Aug 2025 · No. UDP-LBPAS-21426/25-26/BP | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Not verified yet | |
Disputes & cases
Builder: SHIVADHAMA DEVELOPERS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | ₹6.50 Cr disbursed | |
| Survey numbers | 53/5, 53/3B4 ,53/3B3 & 53/5, Survey Number | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,165 sq m | |
| Environmental clearance | Not verified yet | |
|---|---|---|
| Airport height NOC | Not verified yet | |
|---|---|---|
| Pollution board (CFE) | Not verified yet | |
|---|---|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Sold, Q2 2026-27 | 0 / 55 | |
|---|---|---|
| Unsold, Q2 2026-27 | 55 |
Map of mapped waterways within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Nearest mapped waterway or drain | about 3 km to the south-west, Udyavara, river | |
|---|---|---|
| Nearest mapped inland water body | about 1 km, Nair Kere | |
| Height above nearest drain | Not verified yet | |
Map of mapped waterways and water bodies within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Elevation work · Internal and External work including landscapes as per sanctioned drawings · Water Supply · Sewage and Drainage System · Water conservation/rain water harvesting/recharge of ground water · Solid waste management and disposal · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Power Backup · Water and Sanitation · Staircases · Lifts · Corridor/Lobbies · Basement · Terrace · Water conservation and renewable energy · Earth work and other leveling preparation work · Foundation footing work · Upto Plinth Level · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · Retaining wall (All types) · RCC or MS Framed structure · Masonry Construction · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Painting · Elevation work · Internal and External work including landscapes as per sanctioned drawings · Water Supply · Sewage and Drainage System · Water conservation/rain water harvesting/recharge of ground water · Solid waste management and disposal · Water Supply · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Sewage Treatment Plant (STP) · Electricity · CCTV Surveillance · Power Backup · Water and Sanitation · Staircases · Lifts · Corridor/Lobbies · Basement · Terrace · Water conservation and renewable energy | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Groundwater | Not verified yet | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | Not verified yet | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (CMC UDUPI) | |
| Nearest city water main | Not verified yet | |
Mapped waterways, water bodies, roads and transport stations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed 1 km ring is a visual guide; the filing supplies no measured uncertainty.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest mapped waterway or drain | about 3 km to the south-west, Udyavara, river | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station |
|---|
As the promoter reported it
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 15% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Sep 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Maximum height, as filed | Maximum 14.95 m, declared by the promoter | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
The promoter filed this with the registration.
Land · ₹9.14 Cr 46.6%Development · ₹10.47 Cr 53.4%
| Estimated cost | ₹19.61 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (55) 100%
| Sold, Q1 2026-27 | 0 / 55 · 55 available | |
|---|---|---|
| Sold, Q2 2026-27 | 0 / 55 · 55 available | |
| Unsold, Q2 2026-27 | 55 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Union Bank of India | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Filed withdrawal amount, reporting scope not stated | ₹0 (INR) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Developer's project loan | ₹6.50 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 11 Aug 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India | |
| None mapped within 3 km |
| Sewage treatment plant | None mapped within 3 km |
|---|
| Quarry | None mapped within 3 km |
|---|
| Crematorium | None mapped within 3 km |
|---|
| Prison | None mapped within 3 km |
|---|
| Electrical substation | about 2.5 km to the north |
|---|