I have booked a 2 BHK. Post sales service by the CRM team is hopeless. Rathnamma and Ravi, do not bother to call when you request them too. They won't pick up the phone. They are not even sharing the progress of the project. I have written…
SSADIQ PASHA4 Feb 2025★★★★★
Perfect location, Shiram Builder constructing 3 BHK Compact flats with specious Hall, Kitchen and Bed Rooms from past one year price has increased to 8k from 5.5k this is very past growth and during handover the minimum price will be 10.5k…
BBhaskar Malakar24 Nov 2024★★★★★
Very unprofessional attitude from sales team and their manager. Arrogance level is so high. Also RERA number is for Sriram Serenity but they are promoting Sriram Codename Smash Hit. Not sure if this is legit.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shriram Serenity in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Fire NOC
KSFES/NOC/408/2022 · issued 20 Oct 2023 · building height 39.95 m
✓Clear
Environmental clearance
SEIAA 08 CON 2023
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
5 Jul 2029
Registration certificates
PRM/KA/RERA/1251/309/PR/170924/007026
Land use
Conversion order
Land conversion
5 of 5 parcels converted
Sy 74/8, 74/12, 74/13
Converted 24 Sep 2011 · District office,Bangalore
Sy 74/10, 74/15
Converted 10 Mar 2016 · District commisioner office, KG road
Survey numbers
74/8 · 74/10 · 74/12 · 74/13 · 74/15
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Apartments- 2BHK - type1 4.8%Apartments- 3BHK - type3 · avg 81 m² 4.8%Apartments- 3BHK - type9 · avg 96 m² 4.8%Apartments- 3BHK - type8 · avg 96 m² 4.8%19 other types 80.7%
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹17.65 Cr 12%Development · ₹128.93 Cr 88%
Form 4
Estimated cost, at registration
₹146.58 Cr
Estimated cost, architect's and engineer's certificates
₹128.93 Cr
Estimated cost, Form 4 Q1 2026-27
₹146.58 Cr
Cost incurred
₹77.80 Cr (53.1% of the Form 4 Q1 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (270) 100%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
150 / 270 · 120 available
Sold, Q4 2025-26
196 / 270 · 74 available
Sold, Q1 2026-27
270 / 270 · 0 available
Sold, Q2 2026-27
270 / 270 · 0 available
Unsold, Q2 2026-27
0
Sold in Q4 2025-26
46
Sold in Q1 2026-27
74
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
State Bank of Mauritius Ltd. · DICKENSON ROAD,
Designated account, collected
₹18.92 Cr in Q2 2026-27
Designated account, withdrawn
₹4.04 Cr in Q2 2026-27 (21% of that quarter's deposits)
Track record
DOSL builder track
K-RERA registrations under this promoter
7
Marked completed
0
Past promised date, not completed
3
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Yelahanka taluk average, July 2023: 11.4 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class
Through the year
January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several)
Water supply, as filed
BWSSB, Local authority (LOCAL PANCHAYAT)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot