Good project with decent amenities and very fast construction.
Overview
Sky Height Shanthiniketan
Overview
Sky Height Shanthiniketan
Overview
Sky Height Shanthiniketan
Overview
Photo: SKY HEIGHT SHANTHINIKETANTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
A Khatha · ARO HBR LAYOUT · Survey 94/43-41
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 24 Jan 2022 · No. 21/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹82.4 L 4.9%Development · ₹16.00 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 24 Jan 2022 | |
| Escrow bank | HDFC · RICHMOND ROAD |
Data room
116 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Good project with decent amenities and very fast construction.
Nice location and Excellent Project by Sky HIEGHT DEVELOPERS... highly recommended
Highly recommending Project.near to main Road. Clear title project. Even price also affordable.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sky Height Shanthiniketan in the interactive atlas
Approval or registration
Building plan sanctioned
BBMP · plan 21/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/200622/005009
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 94-43-41 | |
|---|---|---|
| Land extent, Sy 94-43-41 | 2,969 sq m | |
| Land area of this registration | 2,871 sq m | |
| Khata | A Khatha · ARO HBR LAYOUT · 20 Apr 2021 |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 12 Nov 2021 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 94-43-41 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Flats measuring 2BHK · avg 62 m² 88.9%Flats measuring 3BHK 8.6%Flats measuring 2.5BHK 2.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| Flats measuring 2BHK | 72 | 47,953 |
| Flats measuring 2.5BHK | 2 | 1,572 |
| Flats measuring 3BHK | 7 | 6,469 |
| Magnolia Delight | about 2 km | Locked | |
|---|---|---|---|
| Lodha Mirabelle | about 2.5 km | Locked | |
| Mirabelle Phase 2 | about 2.5 km | Locked | |
| Brr North Excellency Phase I | about 3.5 km | Locked | |
| Vkk Grand | about 4 km | Locked | |
| Sumadhura Solea | about 4 km | Locked | |
| Sumadhura Epitome | about 4 km | Locked | |
| Legacy Saviero | about 4.5 km | Locked | |
| Cumins Sanctum | about 4.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 4.5 km | Locked | |
| Assetz Soho & Sky | about 5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 5.5 km | Locked |
| Sky Height Shanthiniketan This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 2 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Lodha Mirabelle | about 2.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 2.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Govindapura, Nesar Nagavara |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (81 covered spaces for 81 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 11 Feb 2025 |
|---|
| Schedule end | 1 Oct 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 24 Jan 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
| Power backup | Provided |
|---|
| Architect's certificate, registration | Dated 17 Feb 2022 · site inspected 5 Dec 2021 | |
|---|---|---|
| Engineer's certificate, registration | Dated 21 Feb 2022 |
| Estimated cost, at registration | ₹16.82 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹16.00 Cr |
| Escrow bank | HDFC · RICHMOND ROAD |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 May 2030 |
| 61% (173 of 284) |
| Locked |
| Brr North Excellency Phase I | about 3.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Vkk Grand | about 4 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Sumadhura Solea | about 4 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
|---|
| Projects within 4 km, counted | 24 (24 with an approximate location) | |
|---|---|---|
| Flats in them | 2,875 | |
| Booked | 1,768 of 2,875 (61%) | |
| Unsold | 1,107 | |
| Booked a month, pooled | 17 flats | |
| Months to sell, pooled | 66 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Swami Vivekananda Road | |
| Metro, under construction | about 0.5 km, Kadugondanahalli |
| Kempegowda Airport | 28 | 21 |
| MG Road (CBD) | 8 | 6 |
| Manyata Tech Park | 2.5 | 2 |
| ITPL, Whitefield | 17 | 13.5 |
| Ecospace, Bellandur ORR | 22 | 13 |
| Electronic City Ph 1 | 29.5 | 22 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the north-west, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named HBR Layout on OpenStreetMap |