Overview
Skyline Waterfront
Overview
Skyline Waterfront
Overview
Skyline Waterfront
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Adarsh Greens Phase 1Extended to 31-10-2026 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 366–635 sqft carpet (as filed) | Oct 2025 |
| Adarsh Greens Phase 2Extended to 31-05-2027 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 635 sqft carpet (as filed) | May 2026 |
| Adhishree SunshineWithdrawn | ADHISHREE VENTURES INDIA PVT LTD | Apartment | – | Sep 2021 |
| Adi's North LakeCompleted (regulator flag) | ADI DEVELOPERS | Apartment | 1,435 sqft carpet (as filed) | Completed |
| Affinity SowparnikaCompleted · OC 29-04-2019 | Affinity Projects | Apartment | – | Completed |
| Anugrha ApartmentLapsed · completion date passed | Gayathri Krishna Infrastructure Prospects Private limited | Apartment | – | Apr 2018 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Arun Auroville Phase ILapsed · completion date passed | Arun Shelters Pvt Ltd | Apartment | 2,716 sqft carpet (as filed) | May 2021 |
| Arvind SkylandsCompleted · OC 03-02-2020 | Arvind SmartSpaces Limited | Apartment | 1,063 sqft carpet (as filed) | Completed |
8 of 45 other projects in Jakkur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Skyline Waterfront is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| 4square Park Sierra | about 1 km, to a locality centre | Locked |
|---|
| Legacy Salvador | about 1.5 km, to a locality centre | Locked |
|---|
| Assetz Soho & Sky | about 2.5 km, to a locality centre | Locked |
|---|
| Cumins Sanctum | about 2.5 km, to a locality centre | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 3 km, to a locality centre | Locked |
|---|
| Godrej Aveline | about 3 km, to a locality centre | Locked |
|---|
| Sri Rama Enclave | about 4 km, to a locality centre | Locked |
|---|
| Sumadhura Epitome | about 4 km, to a locality centre | Locked |
|---|
| Century Kindle Phase 1 | about 4 km, to a locality centre | Locked |
|---|
| Sobha City Athena | about 4.5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 4.5 km, to a locality centre | Locked |
|---|
| Tnm Lakeview | about 4.5 km, to a locality centre | Locked |
|---|
| Skyline Waterfront This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| 4square Park Sierra | about 1 km, to a locality centre | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Legacy Salvador | about 1.5 km, to a locality centre | 31 Dec 2026 | 71% (119 of 167) | Locked |
| Assetz Soho & Sky | about 2.5 km, to a locality centre | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 2.5 km, to a locality centre | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Assetz Soho & Sky Phase 1b | about 3 km, to a locality centre | 31 Dec 2027 | 100% (120 of 120) | Locked |
| Godrej Aveline | about 3 km, to a locality centre | 31 Mar 2031 | 91% (769 of 849) | Locked |
| Nearest storm drain |
|---|
| about 0.5 km from the locality centre, tertiary drain |
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body |
|---|
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) |
| Landfill or waste transfer station | about 1.5 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Yelahanka Phase I 10 MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 3 km from the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, tertiary drain |
|---|