Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 52/2 | 14 Nov 2013DC Office, Bangalore | No sale deed | 23 Dec 2024 |
Approvals
| Building plan (Anekal Planning Authority) | Sanctioned 21 Jan 2025 · No. 351/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 27 Nov 2024 | |
| Building plan | Sanctioned 21 Jan 2025 | |
| Escrow bank | KOTAK MAHINDRA BANK · MG Road, Bangalore |
Data room
363 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | 1 | Review |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 4 sections
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
All 279 projects in Electronic City → · Sobha's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Madison Heights-Townpark Phase 2 W1 To 4 in the interactive atlas
| 1 Acre 2 Gunta |
| Survey 54 | ||||
|---|---|---|---|---|
| 54/1 | 16 Feb 2021DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 3 Acre 14 Gunta |
| 54/2 | 22 Nov 2017DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 13 Gunta |
| 54/3 | 16 Nov 2016DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 25 Gunta |
| 54/4 | 7 Sep 2016DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 20 Gunta |
| 54/5 | 16 Nov 2016DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 20 Gunta |
| Survey 55 | ||||
|---|---|---|---|---|
| 55/1 | 11 Oct 2023DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 1 Acre 35 Gunta |
| 55/2 | 23 Oct 2018DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 1 Acre 28 Gunta |
| 55/3 | 18 May 2013DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 1 Acre 2 Gunta |
| 55/4 | 12 Feb 2009DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 2 Gunta |
| 55/5 | 18 May 2013DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 29 Gunta |
| Survey 56 | ||||
|---|---|---|---|---|
| 56/3, 56/4 | 16 Feb 2021DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 8 Gunta + 7 Gunta |
| 56/5 (part) | 24 Feb 2023DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 2 Acre 6 Gunta |
| 56/6 | 30 Oct 2019DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 3.75 Gunta |
| 56/7 | 21 Nov 1991DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 10 Gunta + 13.75 Gunta |
| Survey 58 | ||||
|---|---|---|---|---|
| 58/1 | 30 Dec 2015DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 27.75 Gunta |
| 58/1 | 26 Dec 2014DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 32.75 Gunta + 15 Gunta |
| Survey 59 | ||||
|---|---|---|---|---|
| 59/1 | 26 Dec 2014DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 31.50 Gunta |
| 59/1 | 6 Oct 2016DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 31.50 Gunta |
| 59/2 | 26 Dec 2014DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 9.5 Gunta + 33.50 Gunta |
| 59/2 | 6 Oct 2017DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 7.25 Gunta |
| 60/1 | 11 Nov 2009DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 4 Acre |
|---|
| Survey 73 | ||||
|---|---|---|---|---|
| 73/1 | 20 Nov 2017DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 30 Gunta |
| 73/2 | 18 May 2013DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 30 Gunta |
| 73/3 (part) | 11 Mar 2014DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 1 Acre 10 Gunta |
| Survey 74 | ||||
|---|---|---|---|---|
| 74/6 (part) | 16 Feb 2021DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 30 Gunta |
| 74/7 (part) | 5 Feb 2022DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 1 Acre 8 Gunta |
| 74/8 (part) | 14 Nov 2013DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 2 Acre 23 Gunta |
| 74/11 (part) | 16 Nov 2016DC Office, Bangalore | No sale deed | 23 Dec 2024E Khatha · Local Panchayath | 7.25 Gunta |
K-RERA filing, land schedule
The whole project
Transfer of the land
Title deed executed
Consideration ₹1.50 Cr
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.36 Cr · Sy 54/3; 4/3, Attibele hobli; Attibele hobli
Title deed filed with K-RERA, pp. 1, 12, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.36 Cr · Sy 54/3; 4/3, Attibele hobli; Attibele hobli
Title deed filed with K-RERA, pp. 1, 12, 17 · See it in Documents
Transfer of the land
Title deed executed
Sy 54/2; 4; Sy 54/3; and 2 more items
Title deed filed with K-RERA, pp. 1, 22, 23 · See it in Documents
Transfer of the land
Title deed executed
Yadavanahalli village
Title deed filed with K-RERA, pp. 1, 21 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.34 Cr · Sy 55/3, Yadavanahalli village, Attibele hobli · 1 Acre 02 Guntas
Title deed filed with K-RERA, pp. 1, 9, 16 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.85 Cr
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹15.0 L
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Title deed executed
Sy 56/3, Anekal taluk; Sy 56/4, Anekal taluk
Title deed filed with K-RERA, pp. 1, 23 · See it in Documents
Transfer of the land
Title deed executed
Sy 56/3, Anekal taluk; Sy 56/4, Anekal taluk
Title deed filed with K-RERA, pp. 1, 23 · See it in Documents
Transfer of the land
Title deed executed
Sy 56/3, Anekal taluk; Sy 56/4, Anekal taluk
Title deed filed with K-RERA, pp. 1, 23 · See it in Documents
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan 351/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/230125/007421
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 27 Nov 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: 1 Yadavanahalli ADLR Sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 52/2, 54/1, 54/2, 54/3, 54/4, 54/5 and 21 more | |
|---|---|---|
| Land area of this registration | 25,445 sq m | |
| Khata | E Khatha · Local Panchayath · 23 Dec 2024 | |
| Title deed | Sy 74/8 · 5 Acre 33 Guntas; Sy 148/1, Yadavanahalli village, Attibele hobli, Anekal taluk · 1 Acre 20 Guntas; and 4 more items | |
| Title deed | Consideration ₹2.81 Cr | |
| Title deed | Consideration ₹1.10 Cr · Sy 56/5 |
| Fire NOC |
|---|
| KSFES/NOC/278/2024 · issued 2 Apr 2025 | Clear |
| Environmental clearance | SEIAA 27 CON 2024 · EC identification no. EC24B3813KA5242238N · issued 27 Nov 2024 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2032 |
| Land conversion | 33 of 33 parcels converted | |
|---|---|---|
| Sy 52/2, 74/8(p) | Converted 14 Nov 2013 · DC Office, Bangalore | |
| Sy 54/1, 56/3, 56/4, 74/6(p) | Converted 16 Feb 2021 · DC Office, Bangalore | |
| Sy 54/2 | Converted 22 Nov 2017 · DC Office, Bangalore | |
| Sy 54/3, 54/5, 74/11(p) | Converted 16 Nov 2016 · DC Office, Bangalore | |
| Sy 54/4 | Converted 7 Sep 2016 · DC Office, Bangalore | |
| Sy 55/1 | Converted 11 Oct 2023 · DC Office, Bangalore | |
| Other parcels | 14 more groups on the filing | |
| Survey numbers | 52/2 · 54/1 · 54/2 · 54/3 · 54/4 · 54/5 · 55/1 · 55/2 · 55/3 · 55/4 · 55/5 · 56/3 · 56/4 · 56/5 (p) · 56/6 · 56/7 · 56/7 · 58/1 · 58/1 · 58/1 · 59/1 · 59/1 · 59/2 and 10 more parcels |
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 12.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.13 (720 covered spaces for 640 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 9 Aug 2030 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 7 Mar 2031 | |
| Club house | Not started | |
| Completion | 21% |
| Schedule end | 31 Dec 2032 | |
|---|---|---|
| RERA completion date | 31 Dec 2032 | |
| Work began, as filed | 1 Feb 2026 |
| Building heights, fire NOC | 129.53 m filed, 4 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/278/2024 · issued 2 Apr 2025 | |
| Environmental clearance | SEIAA 27 CON 2024 · EC identification no. EC24B3813KA5242238N · issued 27 Nov 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 29 Nov 2024 · site inspected 29 Nov 2024 | |
| Engineer's certificate, registration | Dated 29 Nov 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹379.02 Cr 33.6%Development · ₹747.76 Cr 66.4%
| Estimated cost, at registration | ₹1126.78 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹1085.51 Cr | |
| Estimated cost, engineer's certificate | ₹741.48 Cr | |
| Cost left | ₹992.18 Cr |
Sold (540) 84.4%Unsold (100) 15.6%
| Sold, Q3 2025-26 | 455 / 640 · 185 available | |
|---|---|---|
| Sold, Q4 2025-26 | 534 / 640 · 106 available | |
| Sold, Q1 2026-27 | 540 / 640 · 100 available | |
| Sold, Q2 2026-27 | 540 / 640 · 100 available | |
| Unsold, Q2 2026-27 | 100 | |
| Sold in Q4 2025-26 | 79 | |
| Sold in Q1 2026-27 | 6 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | KOTAK MAHINDRA BANK · MG Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹8.67 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹21.07 Cr in Q2 2026-27 | |
| Escrow account, Q3 2026-27 | ₹19.01 Cr withdrawn | |
| Escrow account, Q3 2026-27 | ₹36.02 Cr deposited from sales |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 6.5 km, Bommasandra | |
| Metro, under construction | about 16.5 km, Bellandur |
| Kempegowda Airport | 61 | 45.5 |
| MG Road (CBD) | 28.5 | 25.5 |
| Manyata Tech Park | 39 | 31 |
| ITPL, Whitefield | 28 | 21.5 |
| Ecospace, Bellandur ORR | 26.5 | 16.5 |
| Electronic City Ph 1 | 10.5 | 8.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Attibele on OpenStreetMap |