Overview
Sowparnika Ashiyana Phase II
Part ofSowparnika Ashiyana2 phases, 784 flats
Overview
Sowparnika Ashiyana Phase II
Part ofSowparnika Ashiyana2 phases, 784 flats
Overview
Sowparnika Ashiyana Phase II
Part ofSowparnika Ashiyana2 phases, 784 flats
Overview
Part ofSowparnika Ashiyana2 phases, 784 flats

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 23 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 23 pages, not in English.
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress

Developer
| Estimated cost, at registration | ₹92.99 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q3 2025-26 |
Loan & collateral
| Escrow bank | Axis Bank · Marathahalli |
|---|
Data room
101 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 4 sections
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Sowparnika Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sowparnika Ashiyana Phase II in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 17,705 sq m | |
|---|---|---|
| Title deed | Consideration ₹10.21 Cr · Sy 57/2 |
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | SEIAA 21 CON 2019 · issued 27 Mar 2019 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/020819/369837 · issued 21 Mar 2019 · permissible top elevation 937 m above mean sea level · valid until 20 Mar 2027 | Clear |
| Pollution board (CFE) | consent order AW-349535 · issued 9 Jul 2025 · valid until 30 Jun 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest government-flagged flood location | 3.8 km, SIDDHARTHA LAYOUT KADUGODI |
|---|
| Nearest storm drain | 1.7 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the south-west, an unnamed water body |
| Club House, built | 100% | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Water and Sanitation, built | 100% |
| Main structure | 100% · planned by 3 Jul 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 23 May 2025 | |
| Club house | 100% | |
| Completion | 100% |
| Possession, agreement | 14 Apr 2026 | |
|---|---|---|
| Schedule end | 29 Dec 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 17 Jan 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | SEIAA 21 CON 2019 · issued 27 Mar 2019 | |
| Architect, quarterly | Form 5 · Jan 2026 | |
| Architect's quarterly progress certificate dated | 9 Jan 2026 | |
| Architect's site inspection for the quarterly progress certificate | 5 Jan 2026 |
| ₹93.00 Cr |
| Receivable, sold flats | ₹13.87 Cr |
|---|
Sold (419) 99.3%Unsold (3) 0.7%
| Sold, Q3 2025-26 | 419 / 422 · 3 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 3 |
| Escrow bank | Axis Bank · Marathahalli | |
|---|---|---|
| Designated account, collected | ₹7.57 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹7.57 Cr in Q3 2025-26 (100% of that quarter's deposits) |
| K-RERA registrations under this promoter | 12 | |
|---|---|---|
| Marked completed | 9 | |
| Past promised date, not completed | 3 | |
| Other phases under this promoter name | 10 | |
| With a filed extension or completion | 7 (6 completed, 1 extended) | |
| Average schedule slip | 44 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 4.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.7 km to the west, tertiary drain | |
|---|---|---|
| Ground level | 871 m above sea level, plus or minus 4 m | |
| Metro, operational | 4.3 km, Whitefield | |
| Metro, under construction | 10.4 km, ISRO |
| Kempegowda Airport | 43.7 | 41 | 25.7 |
| MG Road (CBD) | 25.4 | 30 | 21.1 |
| Manyata Tech Park | 24.9 | 32 | 20.2 |
| ITPL, Whitefield | 7.4 | 10 | 6.4 |
| Ecospace, Bellandur ORR | 18.0 | 23 | 14.2 |
| Electronic City Ph 1 | 31.7 | 38 | 20.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.4 km to the north-west, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.6 km to the east |