Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sowparnika Indradhanush Phase I in the interactive atlas
Title
Title report
Not verified yet
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (Local Planning Authority)
Sanctioned 11 Mar 2022 · No. HPA/CC/137/2021-22
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/305/2021 · issued 3 Jan 2022
✓Clear
Environmental clearance
SEIAA 101 CON 2021 · EC identification no. EC21B038KA132702 · issued 28 Dec 2021
✓Clear
Airport height NOC
valid until 1 Sep 2029
✓Clear
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 May 2027
Registration certificates
PRM/KA/RERA/1250/304/PR/230522/004913
Land use
Conversion order
Land conversion
Converted 13 Dec 2018 · Deputy Commissioner, Bangalore Rural
Survey numbers
150300401201200581
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Form 4 certified totals
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Agreements in the Form 4 sold list
Not verified yet
Unit sizes
Carpet vs rest, by type
Not verified yet
Unit mix filed
Unit types
•• of ••
₹ ••,•••
•• %
•• ••• ••••
•••••
Floor plans, brochure
Not verified yet
Unsold stock
K-RERA inventory
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Registered deeds
Transactions in this project
Not verified yet
The area
Price trend
East Bengaluru, past yearNot verified yet
Bengaluru, past yearNot verified yet
East Bengaluru since 2022Not verified yet
This project vs East BengaluruNot verified yet
Price per sq ft, super built-up
Not verified yet
By quarter
Not verified yet
Registered sales around
Registered sale price per sq ft, by year
Not verified yet
Transactions around this project
Not verified yet
Comparable projects
Carpet price, projects within 4 km
•• %
•• %
•• %
•• %
•• %
Filed prices nearby
Not verified yet
Nearest 12 with filed prices
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Nearest projects
This project vs the nearest with filed prices
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Rent & yield
Median rent, 3 km
Not verified yet
Gross yield
Not verified yet
Rents and yields
Not verified yet
Unsold stock nearby
Months to sell unsold stock
•• %
•• %
•• %
•• %
•• %
K-RERA inventory
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
The site
Zoning & hazards
Power lines and drains around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Storm drain, primary
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Toilet tiles, spec vs brochure; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Estimated cost
Land · ₹6.98 Cr 4.1%Development · ₹163.82 Cr 95.9%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹170.80 Cr
Estimated cost, architect's and engineer's certificates
₹84.34 Cr
Estimated cost, Form 4 Q1 2026-27
₹217.75 Cr
Cost incurred
₹214.89 Cr (98.7% of the Form 4 Q1 2026-27 estimate)
Cost left
₹2.86 Cr
Collected from buyers
₹194.14 Cr
Receivable, sold flats
₹36.87 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (567) 99.5%Unsold (3) 0.5%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
566 / 570 · 4 available
Sold, Q4 2025-26
567 / 570 · 3 available
Sold, Q1 2026-27
567 / 570 · 3 available
Sold, Q2 2026-27
567 / 570 · 3 available
Unsold, Q2 2026-27
3
Sold in Q4 2025-26
1
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · OLD AIRPORT ROAD
Designated account, collected
₹2.19 Cr in Q2 2026-27
Designated account, withdrawn
₹2.19 Cr in Q2 2026-27 (100% of that quarter's deposits)
Net amount withdrawable, Form 4
₹1,38,87,21,034
Withdrawn from the escrow account to date
₹1,35,89,54,635
Not verified yet: Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Approximate location: the filed pin, good to the neighbourhood, not the plot
Hosakote taluk average, July 2023: 22.6 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Borewell
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot