Good residential flats with all amenities
Overview
Sruthika Springfields
Overview
Sruthika Springfields
Overview
Sruthika Springfields
Overview
Photo: Alisha PradhanTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page, English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 159 CON 2014 | Clear |
| AAI | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹34.85 Cr 31.6%Development · ₹75.57 Cr 68.4%
Loan & collateral
| Escrow bank | ICICI Bank · MATHIKERE |
|---|
Data room
74 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Good residential flats with all amenities
I love the ambience and the silent nature of this place...But some people are quite intrusive to their neighbours
This is the only apartment in Singapura & Kuvempunagar which has a petrol bunk right opposite to the apartment along with grocery shops, Reliance smart, vehicle garage right next to it. The area is very peaceful along with a big swimming…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaApplied for completion 15/11/2026 | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity HarmonyCompleted · OC 01-09-2018 | AFFINITY PROJECTS | Apartment | 1,414 sqft carpet (as filed) | Completed |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Affinity SerenityLapsed · completion date passed | Sudhakara Reddy Annem | Apartment | – | Feb 2022 |
| Alpine Pyramid EfghCompleted (regulator flag) | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 1,066 sqft carpet (as filed) | Completed |
8 of 99 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sruthika Springfields in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 16,190 sq m |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 21 Oct 2020 | |
|---|---|---|
| RERA completion date | 31 Mar 2020 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Forfeiture, agreement | 10% of the sale consideration |
|---|
| Rubby Castle 1 | about 1 km | Locked |
|---|
| Sri Rama Enclave | about 3 km | Locked |
|---|
| Shriram Solitaire | about 3.5 km | Locked |
|---|
| Vruksha Greens | about 3.5 km | Locked |
|---|
| Century Kindle Phase 1 | about 4.5 km | Locked |
|---|
| Royal Enclave | about 5 km | Locked |
|---|
| Assetz Soho & Sky | about 6.5 km | Locked |
|---|
| 4square Park Sierra | about 7 km | Locked |
|---|
| Legacy Salvador | about 7 km | Locked |
|---|
| Cumins Sanctum | about 7.5 km | Locked |
|---|
| Renaissance Srichakra | about 8 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 8 km | Locked |
|---|
| Sruthika Springfields This project | This project is the point the others are measured from | 31 Mar 2020 | – | Not verified yet |
|---|---|---|---|---|
| Rubby Castle 1 | about 1 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Sri Rama Enclave | about 3 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Shriram Solitaire | about 3.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Vruksha Greens | about 3.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Century Kindle Phase 1 | about 4.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Royal Enclave | about 5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Projects within 4 km, counted | 18 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 3,433 | |
| Booked | 2,095 of 3,433 (61%) | |
| Unsold | 1,338 | |
| Booked a month, pooled | 27 flats | |
| Months to sell, pooled | 49 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, Kammagondanahalli near MNTI Polytechnic |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Narasipura |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 31 Mar 2019 | |
|---|---|---|
| RERA completion date | 31 Mar 2020 | |
| Work began, as filed | 1 Jun 2013 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance | SEIAA 159 CON 2014 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹110.42 Cr |
|---|
| Escrow bank | ICICI Bank · MATHIKERE | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, Jalahalli | |
| Metro, under construction | about 5.5 km, Jakkur Cross |
| Kempegowda Airport | 29 | 22.5 |
| MG Road (CBD) | 16 | 13 |
| Manyata Tech Park | 13 | 9.5 |
| ITPL, Whitefield | 30 | 23.5 |
| Ecospace, Bellandur ORR | 31 | 22.5 |
| Electronic City Ph 1 | 35.5 | 30.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Vidyaranyapura Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 3 km to the north, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Abbigere on OpenStreetMap |